Similar Projects
Reconstruction of East Genesee Street Connective Corridor - University Avenue
Post-Bid
Syracuse, NY 13202

Downtown Mill and Pave Salina and State Streets
Post-Bid
Syracuse, NY 13202

Cold Milling of Bituminous Pavement
Term Contract
Results
Syracuse, NY 13202

I - 81 Mill and Fill with Other Minor Maintenance
Results
Less than $8,500,000 est. value
Cicero, Hastings, NY 13039

Project Orange - Kirkville Road Intersection Widening And Signal Installation
Construction
$2,000,000 est. value
DeWitt, NY 13057

Complete Streets Corridor Project - Chestnut Street/Centerville Place/Church Street
Post-Bid
$1,000,000 to $1,200,000 est. value
North Syracuse, NY 13212

Furnishing Cold Mix Bituminous Pavement (Dense Graded)
Term Contract
Results
Syracuse, NY 13202

Asphalt Paving
Term Contract
Post-Bid
Essex, Ulster, Warners, NY

Furnish Hot Mix Asphalt as Specified
Term Contract
Results
Syracuse, NY 13202

Asphalt Paving
Post-Bid

Furnishing Bituminous Surface Treatment (Pavement and Shoulders) as Specified
Term Contract
Results
Syracuse, NY 13202

Furnish Asphalt Concrete Shoulder Paving and Miscellaneous Concrete as Specified
Term Contract
Post-Bid
NY

Furnishing and Application of Paver Placed Surface Treatment
Term Contract
Results
Syracuse, NY 13202

Furnish East First Street Redevelopment Project as Specified
Alteration
Post-Bid
NY

Old Route 57 (CR 91) 1R Paving - PIN 3755.82
Results
Clay, NY

Last Updated 08/06/2021 01:55 AM
Project Title

Mill/Fill Surface, Drainage Improvements, Traffic Signal, Sidewalks, Ramps Upgrades and New Markings

Physical Address View project details and contacts
City, State (County) NY   (Onondaga County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Will Remove And Replace The Top 4 Inches Of Asphalt Surface In Both Directions Of Route 5 From The Western Route 5 Ramp To Myrtle St, a Distance Of Approximately 1.59 Miles. Traffic Will Be Maintained On-Site Using Daily Lane Closures.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents