Similar Projects
Columbia State Farmers Market Buildings HVAC Service and Repair
Term Contract
Post-Bid
West Columbia, SC 29172

Replace HVAC Units and Some Duct Work at Police Department
Post-Bid
Irmo, SC

New Carrier HVAC Units
Results
West Columbia, SC 29169

MDC Dehumidification System Replacement
Results
$150,000 to $200,000 est. value
West Columbia, SC 29170

HVAC and Mechanical Products
Term Contract
Post-Bid

Riverside Water Treatment Plant HVAC Replacement
Results
West Columbia, SC

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

HVAC Unit Replacement at Irmo High School
Results
Columbia, SC 29212

Guaranteed Energy and Water Conservation Services
Infrastructure, Alteration
Post-Bid
Irmo, SC

Air Condenser and Handler
Results
Columbia, SC

HVAC Unit Replacement
Renovation
Post-Bid

Scdmh Coastal Empire HVAC Maintenance
Results
Columbia, SC

Service And Repair Daikin Unit
Term Contract
Results
Columbia, SC

Furnish and Deliver Water Cooled Portable Air Conditioners
Alteration
Results
Columbia, SC

Quarterly HVAC Maintenance at STYX Recieving
Alteration
Results
West Columbia, SC

Last Updated 02/25/2022 09:40 AM
Project Title

Calhoun Building - Replace Air Handlers On 5Th Floor

Physical Address View project details and contacts
City, State (County) Columbia, SC   (Lexington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $325,000 to $350,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Alterations to the existing HVAC system on the 5th floor of the John C. Calhoun Building to remove the existing air handlers from the attic, provide a new air handler on the 5th floor in a newly altered mechanical room, and reconnect the ductwork as well as add new VAV boxes. Work also includes, but is not limited to, demolition, paint, drywall, flooring, trim, doors, ceilings, insulation, electrical and plumbing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents