Similar Projects
Clearview Park Roof Replacement
Bidding
Saint Petersburg, FL

Re-roof Building Four and Covered Walkway
Bidding
$200,000 est. value
Clearwater, FL 33755

Re-Roof Relocatable Classrooms
Post-Bid
Largo, FL 33773

Roof Replacement at Palm Lake Village Apartments
Post-Bid
Dunedin, FL 34698

AFICC Enterprise Wide Roofing Repair, Replacement, and Maintenance (R3M)
Results

MATOC - Army Reserve National Roofing Program (NRP)
Results
Less than $95,000,000 est. value

Roof Replacement
Bidding
$500,000 est. value
Saint Petersburg, FL 33706

Disston Re-roofing
Post-Bid
Saint Petersburg, FL 33713

Roof Repairs and Maintenance
Results
Saint Petersburg, FL 33731

Pinellas Operation Center Warehouse and Supervisors Building Roof Replacement
Bidding
Clearwater, FL 33760

Roofing Envelope Services
Post-Bid

Roof Replacement
Term Contract
Results
Largo, FL 33779

Re-roof Buildings Four and Nine
Bidding
$240,000 est. value
Clearwater, FL 33764

Emergency Repairs, Residential Homes
Post-Bid
Saint Petersburg, FL 33711

Reroofing Buildings and Walkways
Results
Less than $300,000 est. value
Pinellas Park, FL 33782

Last Updated 08/05/2020 09:39 AM
Project Title

Craig Park Recreation Center Roof Replacement

Physical Address View project details and contacts
City, State (County) Tarpon Springs, FL 34689   (Pinellas County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor, tools, material and equipment related for roof replacement services at Craig Park Recreation Center, 100 Beekman Lane, Tarpon Springs, FL 34689: Remove existing shingle and haul off debris from premises Re-nail existing wood decking to current FL bldg. code Dry in one layer of 55mil thick peel and stick underlayment felt Install dimensional fiberglass, fungus resistant, class A self-sealing shingles color to match existing Install shingle with 6 -1”1/4 corrosion resistant roofing nails to manufacturers specifications Install Brown 6” 26 gauge galvanize eave drip around roof perimeter Install 16” wide 26 gauge galvanize metal in all valley areas Install new lead plumbing flashings and galvanize gooseneck vents as required All flashing will be removed by roofing contractor Install new 4x6 galvalume 24 gauge. flashing All flashing and drip edges will be sealed with plastic roof cement Install new ventilation at all peak areas shingles over ridge vent style 30 year warranty shingle or better Workmanship guaranteed for a period of five (5) years

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents