Similar Projects
Sewer Replacement for Tri-Park's Mobile Home Community
Alteration
Design
Brattleboro, VT

ANR - FWL Colchester Point Fishing Access Improvements
Infrastructure
Bidding
$500,000 est. value
Colchester, VT 05446

Trail Restoration Project
Infrastructure
Bidding
$500,000 est. value
Northfield, VT 05663

Mountainside Condominiums Drainage Improvements
Renovation
Post-Bid
Warren, VT 05674

Stormwater Maintenance Program Pipe Lining 2021
Post-Bid
Colchester, VT

Sharon Elementary School Parking Lot Maintenance Drive Improvements
Results
$99,751 est. value
Sharon, VT 05065

North Country Union High School Bus Loop
Results
Newport, VT 05855

Slate Valley Walking Trail
New Construction - 3,600 SF
Construction
Less than $15,000 est. value
Poultney, VT 05764

Central Street Sidewalk Project
Infrastructure
Bidding
$41,000 est. value
Northfield, VT 05663

GSI/CSO: South End Retrofits
Post-Bid
Burlington, VT

Applegate to Willowbrook Path - STP BP14(010) and TAP TA17(010)
Results
Bennington, VT 05201

Amtrak Station Parking Modifications
Infrastructure
Bidding
$600,000 est. value
Brattleboro, VT 05301

Slip Formed Concrete Curbing 2021
Post-Bid
Rutland, VT

Main Street Pedestrian Bridge
Results
$649,790 est. value
Plainfield, VT 05667

Patio Replacement/ Sidewalk Addition
Post-Bid
Bennington, VT 05201

Last Updated 05/18/2022 01:44 AM
Project Title

ANR - FPR Lake Willoughby South End Site Project

Physical Address View project details and contacts
City, State (County) Westmore, VT 05860   (Orleans County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new upper and lower gravel parking lots and site access, a new accessible boat launch drop-off and water access, associated grading and stormwater features, site features including wood barriers and bollards, bike racks, stone steps, stone walls, and concrete signage pads, boulder placement, landscape seeding and landscape planting. b. The Site and Trail projects need to be closely coordinated by the contractor of each project to ensure efficient and timely construction sequencing.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents