Similar Projects
May Street Elevated Sidewalk Replacement
Infrastructure
Design
$1,508,000 CJ est. value
Hood River, OR 97031

OR 281 at Orchard Road (Hood River)
Infrastructure
Design
$1,406,000 CJ est. value
Mount Hood Parkdale, OR 97041

Project Management Services for Hood River-White Salmon Bridge Replacement Project
Demolition, New Construction, Infrastructure
Post-Bid
$520,000,000 CJ est. value
Hood River, OR 97031

Avalon Drive Paving Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Hood River, OR 97031

OR DOT CRGNSA 100(6), Historic Columbia River Highway State Trail
Term Contract, Alteration
Results
Hood River, OR

Hood River WWTP Digester Mixing System
Renovation, Infrastructure
Results
$2,972,000 CJ est. value
Hood River, OR 97031

RFQ Contractor - Bonneville Test Lab Building
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Cascade Locks, OR 97014

OR 281, OR282 and OR 35 Signs, Signals and Lighting
Infrastructure
Design
$811,876 CJ est. value
Hood River, OR 97031

RFQ Contractor - Bonneville Spillway Rock Removal FY23
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Cascade Locks, OR 97014

2 nd and Oak Intersection Improvements
Infrastructure
Results
$867,875 CJ est. value
Hood River, OR 97031

I-84: Columbia River Hwy Culverts phase 2
Infrastructure
Design
$2,000,000 CJ est. value
Cascade Locks, OR 97014

Bonneville 1 Lamprey B-Branch Entrance Improvements
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Cascade Locks, OR 97014

Bridge of the Gods Trailhead Parking Project
Infrastructure
Results
$496,487 CJ est. value
Cascade Locks, OR 97014

St. Mary's Catholic Church
Addition, Demolition, Infrastructure - 3,628 SF
Design
$590,000 CJ est. value
Hood River, OR 97031

2nd and Oak Intersection Improvements Project
Infrastructure
Post-Bid
$525,807 CJ est. value
Hood River, OR 97031

Last Updated 04/07/2023 01:36 AM
Project Title

I-84: Ruckel Creek Culvert

Physical Address View project details and contacts
City, State (County) Cascade Locks, OR 97014   (Hood River County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $909,648 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Repair culvert to extend the life of this structure and prevent further damage As of April 07, 2023, the project is in Final Planning status. Anticipated Construction Year is 2024. ODOT - I-84: Ruckel Creek Culvert *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents