Similar Projects
Scott Boulevard Watermain Replacement Phase III
Bidding
Decatur, GA

Mays Crossing Lift Station and Force Main Rehab
New Construction, Infrastructure
Bidding
Stockbridge, GA

First Street Resurfacing, Street, Water Extension
Post-Bid
Richmond Hill, GA 31324

Harrison Drive and Brown Street Gravity Sewer Improvements
Post-Bid
Gainesville, GA 30501

Disaster Recovery and Sewage Cleaning Services
Term Contract
Results
GA

Contract C - Water Main Extensions
Results
Fort Valley, GA 31030

East Newton Transmission Improvements
Infrastructure
Bidding
GA

McIntyre Sewer System
Post-Bid
McIntyre, GA

Live Valve Insertion Equipment
Results
Less than $71,735 est. value
Valdosta, GA 31603

Line Creek Transmission Main and Distribution System
Infrastructure
Bidding
$8,500,000 est. value
GA

RaceTrac
New Construction
Post-Bid
$500,000 est. value
Marietta, GA 30064

Fairground Street Area Roswell Street to Fraiser Street Water and Sanitary Sewer Relocation
Results
Less than $1,772,701 est. value
Marietta, GA 30060

Operations Center Sanitary Sewer Extension
Infrastructure
Bidding
$100,000 est. value
Oakwood, GA

Water System Improvements
Post-Bid
Less than $1,050,000 est. value
Pavo, GA 31778

Blanchard Water Treatment Plant Lift Station
Results
Evans, GA 30809

Last Updated 08/16/2021 08:24 AM
Project Title

Old Alabama Road Utility Relocation, Phase II

Physical Address View project details and contacts
City, State (County) Cartersville, GA 30120   (Bartow County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,541,060
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Division One: Approx. 8,280 LF of 16-inch DIP water main, 2,260 LF of 12-inch DIP water main, 4,280 LF of 8-inch DIP water main, 820 LF of 24-inch steel casing (open cut and bored), 80 LF of 20-inch steel casing (bored in place), 1040 LF of 16-inch steel casing (open cut and bored), 14 fire hydrants, one minor stream crossing, and 55 service re-connections; all with related, flushing, hydrostatic testing, and disinfection, traffic control, clearing, erosion control, grassing, restoration, pavement replacement, and clean-up - Division Two: Approx. 840 LF of 18-inch DIP gravity sewer, 715 LF of 18-inch PVC gravity sewer, 410 LF of 36-inch steel casing (open cut and bored), and 8 manholes; all with related fittings, connections, appurtenances, traffic control, clearing, erosion control, grassing, restoration, pavement replacement, and clean-up.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents