Similar Projects
ADA and Visitor Parking and Ramp for VIA Hall
Infrastructure
Bidding
Oak Hill, FL 32759

Linda Pedersen Park Boardwalk
Infrastructure
Bidding
$614,570 est. value
Spring Hill, FL 34607

Front Street Complete Streets Project
Post-Bid
Melbourne, FL 32901

Public Private Partnership Redevelopment Opportunity for the Hollywood Beach Culture and Community Center
New Construction - 20,000 SF
Post-Bid
Hollywood, FL 33019

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Sidewalk Concrete Repairs and Construction
Term Contract
Results
$1,000,000 est. value
Orlando, FL 32802

Resurfacing/Sidewalk/Signing and Pavement Markings - SR 100A
Infrastructure
Bidding
$576,566 est. value
FL

Multi-Use Trail Project
Post-Bid
FL

VCA/ADA Accessibility Improvement to Common Areas and Parking Spaces - 6830/6870 West 7th Avenue
Results
Hialeah, FL 33014

Resurfacing/Bike Lane/Sidewalk/Signing and Pavement Markings - SR 597 (Dale Mabry Hwy)
Infrastructure
Bidding
$9,607,200 est. value
FL

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

Reus Street Revitalization, Phase 1: from Main Street to Garden Street
Results
Pensacola, FL 32502

Roger Scott Tennis Center Improvements
Renovation, Infrastructure
Bidding
Pensacola, FL 32503

Manatee High School Safety Improvements (North)
Post-Bid
Bradenton, FL 34201

Sidewalk Improvements - Multiple Sites
Results
Less than $1,433,636 est. value
Miami, FL

Last Updated 11/15/2021 10:47 AM
Project Title

Monument Avenue Sidewalk Project

Physical Address View project details and contacts
City, State (County) Port Saint Joe, FL 32456   (Gulf County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Demolition of existing sidewalk and the installation of new sidewalks along Monument Avenue and other areas within the City Limits. 1. Demolition of the existing sidewalk from 9th Street to 13th Street on both the East and West sides as marked along with the installation of new which some areas will require root removal/grinding prior to repouring. There is 1,364 LF or 6,820 sq ft. of sidewalk to remove and repour. 2. Demolition of existing sidewalk at Dooder Park (16th Street) and installation of new 200 LF or 1,000 Sq ft. along with the installation of 12 - 4’x8’x4” Disc Golf Pads throughout Dooder Park and Buck Griffin Lake as marked. Each pad shall be flush with the existing grade. Installation of a 30’ x 20’ x 4” concrete pad as marked at Dooder Park. 3. Installation of 6 – 4’ x 8’ x 4” Disc Golf Pads throughout the Washington Gym Complex as marked. Installation of a 30’ x 20’ x 4” concrete pad as marked at the Washington Gym Complex.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents