Similar Projects
Main Street and Railway Street Reconstruction
Infrastructure
Bidding
Freeman, SD

9th and 5th Reconstruction
Infrastructure
Bidding
Mitchell, SD

East 1st Street Extension
Post-Bid
$4,000,000 est. value
Tea, SD 57064

2021 Sanitary Sewer CIPP Lining
Post-Bid
Spearfish, SD 57783

Gateway Boulevard (CR106) Phase 2 Improvements
Results
Less than $14,500,000 est. value
Tea, SD 57064

Lake Norden Main Lift Station Improvements
Results
$575,000 to $600,000 est. value
Lake Norden, SD 57248

Harrisburg Schools 3rd Addition Street Construction
Infrastructure
Bidding
Sioux Falls, SD 57109

Streeter Drive Realignment
Post-Bid
$1,281,000 est. value
North Sioux City, SD

33rd Street and Minnesota Avenue Intersection Reconstruction, Utility Improvements, Pavement Repairs and ADA Improvements
Results
Less than $1,760,000 est. value
Sioux Falls, SD

Grandstand Way Sanitary Sewer Replacement
Infrastructure
Bidding
$600,000 est. value
Huron, SD 57350

CCTV Sewer Cleaning and Inspection Rosebud Sewer Collection System
Post-Bid
Rosebud, SD

Abandon Omaha Trunk Sewers - 1st Street to Maple Avenue
Results
Rapid City, SD 57701

Industrial Park Development & Industrial Park Lift Station
New Construction, Infrastructure
Bidding
Wall, SD

2021 Sewer Main Relining
Post-Bid
$300,000 to $350,000 est. value
Brookings, SD

South Street Sewer Extension
Results
$600,000 est. value
Rapid City, SD 57701

Last Updated 03/09/2022 03:11 PM
Project Title

Regionalization Wastewater Pump Station and Forcemain

Physical Address View project details and contacts
City, State (County) Tea, SD   (Lincoln County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

will consist of the installation of approximately 1,150 feet of 27 sanitary sewer pipe, approximately 25,000 feet of 16 force main pipe installed by open trench and horizontal directional drilling, and approximately 2,000 feet of 24 and 30 sanitary sewer pipe. The sewer and force main route will generally start at the Citys existing Lagoon Lift Station near Heritage Parkway, extend east and then north along Sundowner Avenue to 69th Street, and then east to the I-29. Associated work will include topsoil and subgrade earthwork removal, placement of sanitary sewer and force main pipe and appurtenances (manholes), backfilling the excavated sewer trench, and surface restoration/topsoil replacement as detailed and shown in the Contract Documents. The project will also consist of the construction of a new sanitary pump station on the south side of the Citys lagoons. The pump station will be submersible style with below grade cast-in-place concrete splitter structure and divided wet well, standby generator, above grade building for housing the pump controls, discharge piping, valves, and meters and site work as detailed and shown in the Contract Documents.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents