Similar Projects
Painting services for Two District 214 Field House Ceilings
Bidding
Arlington Heights, IL

McCook Max Exterior Painting
Post-Bid
Less than $200,000 est. value
McCook, IL 60525

Painting Services at the Harold Washington Social Security Center
Post-Bid
Chicago, IL 60661

Cleaning and Painting Existing Steel on the Structures Carrying, Michigan Ave. over 1-55, in the South Chicago Township, and Roosevelt Road Over IHB Rail Road
Results
IL

Wendell Phillips Academy HS
Results
Less than $1,000,000 est. value
Chicago, IL 60602

Oak Park Central Pumping Station Drywall Repair and Painting
Post-Bid
Oak Park, IL 60302

Bridge Painting
Results
Calumet City, Thornton, IL 60409

Street Light Pole Painting
Post-Bid
Morton Grove, IL 60053

Cleaning and Painting Steel Structure
Results
Palos Heights, Worth, IL 60482

State Street Elevated 750,000 Gallon Tank Painting
Post-Bid
Less than $600,000 est. value
Lemont, IL 60439

Cleaning and Painting Designated Existing Steel
Results
Glencoe, IL

Main Library Interior/Exterior Painting
Post-Bid
Evanston, IL 60201

Streamwood High School Painting Project Phase Three
Results
Streamwood, IL

Aquatic Centers Painting
Post-Bid
Chicago, IL 60646

Mission Brook Sanitary District - Ground Storage Tank Repainting
Results
Northbrook, IL 60062

Reported 12/10/2020 12:00 AM
Project Title

Oakton Street Water Tank Painting

Physical Address View project details and contacts
City, State (County) Des Plaines, IL 60018   (Cook County)
Category(s) Single Trades
Sub-Category(s) Painting
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency - 11/05/20
Owner View project details and contacts
Architect View project details and contacts
Description

Tank Information: Exterior: High pressure water clean (5,000 to 10,000 psi), spot power tool clean to a SSPCSP11 standard, and apply a three (3) coat epoxy urethane system. Wet Interior: Abrasive blast clean to a SSPC-SP10 near-white metal standard and apply a three (3) coat zinc epoxy system. Apply a polyurethane caulk to the roof lap seams. The mechanical mixer is to be removed and reinstalled after the topcoat is cured. Foundation: Water clean and apply a two (2) coat epoxy system

Details

Division 09 - Finishes, Painting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents