Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Construct New DNA Laboratory Facility
New Construction, Infrastructure
Design
$23,000,000 CJ est. value
Greensburg, PA 15601

Milling of City Streets
Post-Bid
Greensburg, PA

Milling and Resurfacing of City Streets
Post-Bid
Greensburg, PA 15601

Roadway Surfacing
Results
Ligonier, PA 15658

Install Water Pipeline for Waterline Replacement Project
Results
New Stanton, PA

2021 Hot Mix Paving Program
Post-Bid
Latrobe, PA

Waterline Relocation Project
Results
Mount Pleasant, PA

2021 Annual Superpave Asphalt Bid
Term Contract
Post-Bid
Latrobe, PA

Repair of Road Surfaces
Term Contract
Results
New Stanton, PA 15672

Replace Existing Water Main
Post-Bid
Ligonier, PA 15658

2021 Waterline Extension
Results
New Kensington, PA 15068

2021 Paving Program
Post-Bid
Greensburg, PA

Allegheny Avenue Street Reconstruction Project - 6th to 7th Street
Results
Avonmore, PA 15618

Last Updated 08/18/2022 08:03 AM
Project Title

Harrison Park / Dolly Avenue Storm Water Improvements Project

Physical Address View project details and contacts
City, State (County) Harrison City, PA 15636   (Westmoreland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,590,247 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 17, 2022. Project has been awarded to Curry & Kepple, Inc. with a base bid in the amount of $1,590.247.40. The work will consist of the Contractor performing detention pond retrofits, storm sewer/ culvert pipe installation, inlet boxes, manholes, paving, restoration, erosion control, and appurtenances. The Contractor is advised that this project is being funded through the Pennsylvania Infrastructure Investment Authority (PENNVEST). Pennsylvania Prevailing Wage requirements apply to Contract 3/2022 as determined by the Secretary of the Department of Labor and Industry. All contractors must adhere to Act 127 of 2012 (Public Works Employment Verification Act), Nondiscrimination/Sexual Harassment Provisions, State Contractor Responsibility Program, the Americans with Disability Act, Anti-Pollution Regulations, Contractor Integrity Provisions, Prohibition of Illegal Alien Labor on Assisted Project Act and the Right-of-Know Law and the American Iron & Steel Act. Each Proposal shall be accompanied with a certified check or Bidder's Bond in the amount of ten percent (10%) of the proposal, in favor of Penn Township. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening. Penn Township reserves the right to reject any or all bids or to waive any informality in bids received.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents