Last Updated | 06/22/2023 02:08 PM |
Project Title | FY 2023 ARPA and GEFA Southeast Wastewater Treatment Plant (WWTP) Improvements |
Physical Address | View project details and contacts |
City, State (County) | Douglas, GA 31535 (Coffee County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected June 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work to be completed for the FY 2023 ARPA and GEFA Southeast WWTP Improvements is described briefly as follows: In general, construction shall consist of installation of new propeller-type aeration equipment in the aeration basins and new disk filters retrofit into the existing travelling bridge filter basins. Upgrades to the SCADA plant control system are also included No bid may be withdrawn after the closing time for the receipt of bids for a period of sixty (60) days. Any Contractor submitting a bid must be licensed by the State of Georgia. See Instructions to Bidders for additional bidding requirements. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price, shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. 6. Funding: This project is funded through the American Rescue Plan Act (ARPA) and by the GEFA Clean Water SRF Program requiring compliance with applicable state and federal bid laws. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner |
||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |