Similar Projects
Rural Street Underpass Clearance (Construction) - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$6,571,000 CJ est. value
Indianapolis, IN 46218

Rural Street Underpass Clearance (Construction) - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$6,571,000 CJ est. value
Indianapolis, IN 46218

The Flats at HC / Camby
New Construction
Design
$88,000,000 est. value
Indianapolis, IN 46113

Culver's - Southern Plaza / Indianapolis
New Construction, Infrastructure - 4,800 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46227

Lawrence 2022 Sewer and Manhole Rehabilitation
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Lawrence, IN 46226

Ben Davis High School Exterior Improvements
Infrastructure
Post-Bid
$300,000 CJ est. value
Indianapolis, IN 46214

Asphalt Paving of Existing Gravel Parking Lot
Infrastructure
Results
$150,000 est. value
Indianapolis, IN

Maintenance Building Pavement Rehabilitation
Infrastructure
Results
Indianapolis, IN

Community and Education Center and Hilltop PK and Preschool
Renovation, Addition - 68,050 SF
Construction
Less than $19,398,000 est. value
Indianapolis, IN 46200

Indianapolis Academic Health Center Medical Education and Research Facility
New Construction, Infrastructure
Construction
$50,000,000 CJ est. value
Indianapolis, IN 46202

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

South Madison Park and Ride - IndyGo - Indianapolis Public Transportation
Infrastructure
Conception
$2,100,000 CJ est. value
Indianapolis, IN 46204

Sapphire Ridge Subdivision
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Indianapolis, IN 46239

North Wayne Site, Playgrounds, and Asphalt Improvements
Renovation, Alteration
Post-Bid
$200,000 est. value
IN

Last Updated 09/28/2023 12:10 PM
Project Title

4005 North Franklin Road Mixed-Use Development

Physical Address View project details and contacts
City, State (County) Indianapolis, IN 46226   (Marion County)
Category(s) Education, Heavy and Highway, Religious/Funeral, Residential
Sub-Category(s) Apartments/Condominiums, Elementary School, Paving/Reconstruction, Pre-School/Daycare, Religious Facility, Site Development, Vocational School
Contracting Method Bids by Invitation
Project Status Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $15,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a residential development with a daycare center, religious building, and educational facility. Further scope has not been released. As of September 28, 2023, no applications have been submitted for building permits. This project is likely still on indefinite hold and may never move forward. It received site plan approval from the Marion County Metropolitan Development Commission. An architect has been selected; however, a general contractor or selection method is not disclosed. A timeline for construction has yet to be announced. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures, Religious Equipment.
Division 12 - Furnishings, Religious Art, Casework, Specialty Casework, Religious Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents