Similar Projects
Last Updated | 12/20/2018 09:17 AM |
Project Title | Rehabilitation of Manholes Inflow and Infiltration |
Physical Address | View project details and contacts |
City, State (County) | Miami, FL (Miami-Dade County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sanitary Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $858,402 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Project consists of furnishing all labor, material and equipment for rehabilitation of approximately 500 manholes anywhere within the limits of Miami-Dade County, Florida, as ordered by the Department during a one year period. The work of the manhole rehabilitation shall include, but not be limited to, furnishing and installing concrete protective coating; high pressure cleaning; pre-resurfacing and post-rehabilitation video inspection; surface preparation; sealing leaks with chemical injection grout by drilling thru the manhole; sand blasting, if required; concrete repair and restoration; restoring manhole to the original shape or as otherwise approved by the Engineer; grouting voids; cleaning and restoring exposed reinforcing; applying cement underlayment; restoring manhole bench and flow channels; removing broken steps and repairing holes in manholes with broken steps; rehabilitate underside of flat-top manholes; replace misaligned, broken or missing frame seals; furnishing and installing plugs, thru plugs and thru pipe as required; bypass pumping of sewage, if necessary; traffic control; legal disposal of debris; furnishing and utilizing all required safety equipment; and all other miscellaneous and appurtenant work for a complete manhole rehabilitation. The manholes to be rehabilitated are located throughout Miami-Dade County. Approximately 60 of these manholes were coated with rubber-based coating which failed. The failed rubber-based coating and all other coatings shall be completely removed before repairs are made to the manholes. | ||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |