Similar Projects
Moppert Bros. Auto Collision Services
Renovation - 15,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Northfield, NJ 08225

Car Sales and Service
Build-Out
Conception
Trenton, NJ 08638

Tennent Road Wash & Lube
New Construction - 3,320 SF
Design
Marlboro, NJ 07751

Haldeman Subaru
New Construction - 41,360 SF
Design
Robbinsville, NJ 08691

South Jersey Yacht Sales
New Construction, Infrastructure - 10,527 SF
Bidding
$2,800,000 CJ est. value
Somers Point, NJ 08244

Manahawkin Chrysler Dodge Jeep Ram
New Construction
Sub-Bidding
$9,000,000 est. value
Stafford Township, NJ

Modwash Car Wash
New Construction - 40,959 SF
Post-Bid
Turnersville, NJ 08012

Tesla Service
Renovation - 35,805 SF
Post-Bid
Springfield, NJ 07081

Bus Washing Systems Inspection, Repair, Preventative Maintenance Contract
Results
Newark, NJ

Miscellaneous Garage and Vehicle Wash Upgrades
Renovation
Results
Clark, NJ

Classic Auto Wash
New Construction - 640 SF
Construction
$325,000 est. value
Winslow, NJ 08095

Automotive Avenues
Renovation, Addition - 23,000 SF
Construction
$6,300,000 est. value
Farmingdale, NJ 07727

Auto Dealership Service Center
New Construction - 11,120 SF
Pending Verification
Freehold, NJ 07728

Auto Storage Addition
Addition - 4,125 SF
Pending Verification
Allentown, NJ 08501

Carmax
New Construction
Design
Hamilton, NJ 08330

Last Updated 08/23/2022 08:33 AM
Project Title

Automotive Storage & Detailing Facility

Physical Address View project details and contacts
City, State (County) Egg Harbor Township, NJ 08234   (Atlantic County)
Category(s) Commercial
Sub-Category(s) Car Wash, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $264,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of new construction of a new construction of Car Wash, Retail, Warehouse/Storage, and 48 Parking Spaces. As of August 8, 2022 this project is in Construction Documents. Name of architect, general contractor has been released. A hard construction start date, timeframe has not been released. Construction is expected to begin November 2022.

Details

Division 01 - General Requirements, Construction Facilities, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Frames, Metal Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Overhead Coiling Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Plaster and Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle Service Equipment, Compressed-Air Vehicle Service Equipment, Vehicle Lubrication Equipment, Tire-Changing Equipment, Vehicle-Washing Equipment.
Division 12 - Furnishings, Office Accessories, Rugs and Mats, Office Furniture, Interior Planters and Artificial Plants.
Division 14 - Conveying Equipment, Vehicle Lifts.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Eyewash Equipment, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Security Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Voice Communications Messaging.
Division 28 - Electronic Safety and Security, Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Fuel-Oil Detection and Alarm.
Division 31 - Earthwork, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Parking Bumpers, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Sanitary Sewerage Utilities.
Division 41 - Material Processing and Handling Equipment, Cranes and Hoists.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents