Similar Projects
Utility Analysis Zone 108
New Construction, Infrastructure
Bidding
$540,038 est. value
Pompano Beach, FL 33060

New Raw Water Supply Line (Between Water Treatment Plant and Eastern Wellfield)
Infrastructure
Bidding
$3,000,000 est. value
Hollywood, FL 33024

Provide an On-Site Calibration and Verification of 26 Abb Flow Meters
Term Contract
Post-Bid
Less than $10,995 est. value
Hollywood, FL

Water System Interconnect Upgrades
Post-Bid
Pompano Beach, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

GTL Dewatering Building Drain/Vent Pipe Replacement
Results
Fort Lauderdale, FL 33316

Pines Village Water Main Improvements Phase II and Septic Tank Conversion
Infrastructure
Bidding
$13,778,000 est. value
Pembroke Pines, FL

BCJC Jail Water Meter Reconfiguration
Post-Bid
Fort Lauderdale, FL 33301

12 Inch Water Main Installation Foster Road
Results
Less than $1,496,057 est. value
Hallandale, FL 33009

Bamford Park and University Drive Reclaimed Water Mains
Infrastructure
Bidding
$1,400,000 est. value
Davie, FL 33328

Positive Displacement Cold Water Meters
Infrastructure
Post-Bid
Oakland Park, FL 33309

Raw Water Well #9 Pipeline
Results
Hallandale, FL 33009

Utility Replacement along North 26th Avenue (Phase 1)
Infrastructure
Bidding
Hollywood, FL 33020

Repair and Calibration of Flow Meters and Related Services
Term Contract
Post-Bid
Coral Springs, FL

WTP Finished Water Meter
Results
Less than $398,000 est. value
Tamarac, FL 33321

Reported 01/27/2022 12:00 AM
Project Title

2018 Water Main Improvements - Phase 1A

Physical Address View project details and contacts
City, State (County) Margate, FL   (Broward County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish all labor, materials, accessories, equipment, tools, transportation, services and technical competence necessary for the installation of new water mains. The Work shall include the installation one inch (1”) service taps to residential properties and reconnection of these properties to the newly installed 4”, 6”, 8”, and 10” water mains as required. The project scope shall include all system appurtenances including but not limited to gate valves, air release valves, fire hydrants, and backflow preventers. The contractor shall be responsible for obtaining all regulatory approvals, including the Department of Health and the Florida Department of Environmental Protection, for performing all testing and disinfection required to commission newly installed water mains and services. The old Asbestos Concrete water pipes shall be filled with grout and abandoned in place.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents