Similar Projects
Avalon Pedestrian Bridge and Gateway Projects - Port of Los Angeles - Construction Division
New Construction, Infrastructure
Conception
Los Angeles, CA 90744

Expo/Crenshaw Transfer Station Improvements - Los Angeles County Metropolitan Transportation Authority
Infrastructure, Renovation
Conception
$999,000,000 CJ est. value
Los Angeles, CA 90012

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Verandas Apartments
Demolition, New Construction, Infrastructure
Bidding
$26,000,000 CJ est. value
Manhattan Beach, CA 90266

Remove Existing AC Pavement and HMA Overlay
Infrastructure
Bidding
$42,000,000 CJ est. value
Los Angeles, CA 91364

Los Angeles Valley College Academic Complex 1
New Construction, Infrastructure - 80,000 SF
Post-Bid
$60,000,000 CJ est. value
Los Angeles, CA 91401

RFQ D/B - Los Angeles Valley College Demolition of Theater Arts Building
Demolition, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Los Angeles, CA 91401

Suzanne Middle School New Two Story 10 Classroom Science and Technology Building and New Gymnasium
New Construction - 16,672 SF
Results
$17,000,000 est. value
Walnut, CA 91789

Rehabilitation of Wells Commission 15 and Commission 18
Infrastructure
Results
$3,496,020 CJ est. value
Long Beach, CA 90808

The Mark at Los Angeles
Demolition, New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Los Angeles, CA 90024

San Pedro Courthouse Redevelopment / Los Angeles
New Construction, Infrastructure, Build-out - 361,500 SF
Construction
$10,000,000 CJ est. value
Los Angeles, CA 90731

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

C Line (Green) Extension To Torrance - Los Angeles County Metropolitan Transportation Authority
New Construction, Infrastructure
Conception
$999,000,000 CJ est. value
Torrance, CA 90503

Last Updated 01/08/2024 09:10 AM
Project Title

RFQ D/B - Canoga Park High School Major Modernization Project

Physical Address View project details and contacts
City, State (County) Los Angeles, CA 91303   (Los Angeles County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected April 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $95,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Project consists of the construction of new school buildings, the modernization of existing school facilities, and the demolition of aging and deteriorating buildings. The Project scope also includes, as necessary, to accommodate the temporary displacement of any facility and its associated function during construction. 2.1 Detailed Scope of Work A. New Buildings 1. Food Services/Classroom Building a) Ten (10) general classrooms b) Two (2) special education classrooms c) Associated support spaces d) Cafeteria e) Lunch shelter f) Student store g) Weight room with storage 2. Maintenance & Operations/home concessions and restrooms with storage 3. Visitors' concessions and restrooms with storage 4. Covered walkways/arcades B. Demolition 1. Select existing covered walkways/arcades as impacted by the project scope 2. Cafeteria Building/Lunch Shelter 3. Shop Building #1/Weight Room 4. Classroom Building #5 5. Parent Center Building 6. Seven relocatable classroom buildings (A-795, A-796, A-797, A-798, AA-396, AA-290, AA-324) 7. Two (2) J-Buildings (J-131 & J-219) 8. Stadium Restroom Building (J-120) 9. Stadium ticket booths 10. Relocatable Storage Building (AA-293) 11. Storage Building (M-900) 12. Visitors' Concessions Storage Unit 13. Existing running track 14. Existing football field turf 15. Existing scoreboard C. Site Improvements 1. Utilities upgrades within limits of work a) Replace and upgrade storm water, sewer lines and water lines b) Electrical and low voltage upgrades c) CCTV and site lighting upgrades 2. Landscaping and irrigation 3. Hardscaping 4. Fencing and gates 5. Site furnishings and accessories 6. Trash enclosures 7. Parking 8. Exterior painting of remaining structures, including miscellaneous support buildings (utility, storage, etc.) 9. Path-of-travel and barrier removal upgrades 10. New synthetic running track 11. New natural grass football field with irrigation 12. Upgrades to the track features within the field (i.e., long jump, high jump, shot put) 13. Bleacher repairs (including accessibility upgrades) 14. New LED scoreboard D. Utility agency approvals and connections E. Approvals from other Regulatory Agencies as required F. Coordination of District furnished furniture, fixtures and equipment (FF&E) G. Interim facilities as required to implement proposed project phasing H. Upgrade/recovery of any campus areas as impacted by interim housing I. Improvements as required by the Americans with Disabilities Act (ADA), Division of the State Architect (DSA), California Environmental Quality Act (CEQA), Department of Toxic Substances Control, and any other required improvements or mitigations to ensure compliance with local, state, and/or federal facilities requirements Requests for Clarification/Information (RFC/RFI) Due 3:00 p.m., July 12, 2023 RFC/RFI responses issued by District July 19, 2023 Shortlist Announced August 18, 2023 Issuance of RFP (on or before) August 28, 2023 Workshop #1 Week of September 18th, 2023 Workshop #2 Week of October 9th, 2023 Last Day to Submit RFCs/RFIs October 18, 2023 Issuance of Final Addendum October 25, 2023 Draft Non-Price Proposal/Final Pres. Materials Due 11:00 a.m., November 17, 2023 Final Presentation Week of November 27th, 2023 Issuance of Confidential Comments December 13, 2023 Final Non-Price Proposal Due 11:00 a.m., December 22, 2023 Sealed Price Proposal Due 11:00 a.m., January 19, 2024 Selection of Design-Build Entity/Notice of Intent to Award January 2024 Anticipated BOE Approval to Award Contract March 2024 Anticipated Issuance of Notice to Proceed March/April 2024 The project is anticipated to be completed no later than the second (2nd) quarter of 2029. The project may be developed in phases, allowing the school to be fully operational during construction. During the RFP Design-Build Competition, each of the shortlisted Proposers will be required to submit their best schedule and phasing plan that meets or exceeds the goals of the project. Consideration should be given to all major logistical factors such as school operations, construction phasing, labor and materials conditions and impacts to the surrounding neighborhood. Electronic Format: Provide one (1) USB of the SOQ, using read-only Word files or Adobe Acrobat PDF files and email one (1) copy to jenny.trieu@lausd.net on or before the due date and time indicated in the Important Initial Information page of this RFQ. Request for Qualification Submittals: Design-Build Entities may mail, ship or hand deliver (1 unbound original and 1 USB) qualification submittals in a sealed envelope or box clearly marked "R-23022 - Canoga Park High School Major Modernization Project" and submit to the address as indicated in the Important Initial page of this RFQ. Both electronic mail and hardcopy submissions are required. Oral, telephonic or fax submissions will be rejected. Submittals will be time and date stamped upon receipt. At the sole discretion of the District, submittals received after the time and date indicated may not be accepted. Factors, including, but not limited to, traffic, weather, parking, and building security, are the responsibility of the Design-Build Entity, not the District. Submittals are due no later than date and time indicated in the Important Initial Information page of this RFQ. Design-Build Entities shall assume full responsibility for timely delivery at the location designated for receipt of submittals. The SOQ submittals will NOT be publicly opened. Design-Build Entities will bear all costs of this RFQ/RFP except for any compensation provided by the District. Provide identification of the person authorized to contractually bind the Design-Build Entity, including, without limitation, the authority to bind Design-Build Entity to the terms of contract adjustments and certify under penalty of perjury that the SOQ is accurate and complete. The District may investigate the qualifications of any proposer under consideration, require confirmation of information furnished by a proposer, and require additional evidence of qualifications to perform the services described in the RFQ/RFP. The District reserves the right to: a. Reject any and/or all proposals. b. Revise through Addendum and/or cancel the solicitation. c. Issue subsequent solicitations. d. Remedy technical errors in the solicitation process. e. Award in any combination of the bid (e.g., by line, by category, as a whole, or not award). f. Seek the assistance of outside technical experts in qualification and proposal evaluation. g. Approve or disapprove the use of particular subcontractors. h. Award a contract to one or more proposers. i. Waive informalities and irregularities in the RFQ/RFP. j. Award without discussion. k. Disqualify proposers upon evidence of collusion with intent to defraud or other illegal practices on the part of the proposers. l. Negotiate contract terms with the apparent successful Proposer District has adopted a Small Business Enterprise ("SBE"), Micro-SBE, Veteran Business Enterprise ("VBE") and Disabled VBE Participation Program ("DVBE"), which includes businesses owned by small business enterprises, as defined by SBE, Micro-SBE, Veterans and by Disabled Veterans. District has established participation goals to attain twenty-five percent (25%) of the contract dollars going to certified SBE/Micro- SBE and five percent (5%) going to VBE/DVBE. All Proposers shall implement policies, procedures and methods to meet these goals, which may include but not be limited to the procurement of supplies, equipment, technical services, and/or other services under this contract.

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents