Similar Projects
Wayne NF MATOC IDIQ ~ Roads and General Construction
Term Contract
Design

Pavement Repair
Infrastructure
Bidding
$865,484 est. value
Cincinnati, OH

First Street Improvements (OPWC)
Infrastructure
Bidding
$297,000 est. value
Addyston, OH 45001

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Post-Bid

Chip & Seal Bid
Post-Bid
Reading, OH 48783

Major Reconstruction - HAM-74 - 18.01
Results
Cincinnati, OH 45203

Delhi Township Rehabilitation and Repair Project
Results
Less than $885,423 est. value
Cincinnati, OH 45200

Downtown Loop Streetscape
Infrastructure
Bidding
$400,000 est. value
Sharonville, OH

Blacktop on Bells Run Road
Post-Bid
White Oak, OH

2020 Summer Pavement Improvements
Results
Less than $425,000 est. value
Cincinnati, OH

Elbrook Avenue Improvements
Infrastructure
Bidding
$300,000 est. value
Golf Manor, OH 45237

Crack and Joint Sealant (MBE Only)
Term Contract
Post-Bid

Addyston Park Road and Walking Path Asphalt Project
Results
Addyston, OH 45001

Intersection
Infrastructure
Bidding
$4,040,000 est. value
Dry Run, OH 45244

Chip and Seal Bid
Infrastructure
Post-Bid
OH

Reported 06/13/2022 03:42 PM
Project Title

Wasson Way Uptown Connector Trail - State of Ohio

Physical Address View project details and contacts
City, State (County) Cincinnati, OH 45207   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2023
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Cincinnati, Ohio. Conceptual plans call for site work for a road / highway; and for paving for a road / highway. A detailed scope has not yet been determined. This project is in included in the State of Ohio - Administrative Services FY 2022-2023 Capital Improvement Plan (CIP). As of June 10, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents