Similar Projects
Robertson County Offices Parking and Stormwater
Infrastructure
Bidding
$300,000 CJ est. value
Springfield, TN 37172

TCAT HVAC, Plumbing and Lighting Upgrades
Alteration
Post-Bid
$640,000 est. value
Paris, TN 38242

Plumbing Service and Repair
Term Contract
Post-Bid
Less than $25,000 est. value
Nashville, TN

Correct Plumbing Piping and Replace Fixtures
Results
$5,000,000 to $10,000,000 est. value
Memphis, TN 38104

Pink Palace Museum - Mansion Plumbing Replacement
Alteration
Results
$48,900 est. value
Memphis, TN 38111

Water Bottle Filling Stations
Alteration
Post-Bid
Tazewell, TN

South Water Treatment Plant Piping Modifications
Infrastructure, Alteration
Results
Millington, TN 38053

Miscellaneous Plumbing Services Supplementary
Term Contract
Post-Bid
Knoxville, TN

Plumbing Improvement at Mill Creek Middle
Alteration
Results
$139,000 est. value
Nolensville, TN 37135

2018 Humboldt LPRF Parks ADA Building Improvements
Infrastructure
Post-Bid
Humboldt, TN

Floor Drains and Plumbing Upgrades
Renovation
Results
$821,212 CJ est. value
Nashville, TN 37203

Lawrenceburg Head Start Plumbing
Infrastructure
Post-Bid
Lawrenceburg, TN

Kinsler Ave. & Parkcliff Dr. Waterline Replacement
Infrastructure
Results
$321,589 CJ est. value
Kingsport, TN 37660

Plumbing Services Contract
Term Contract
Post-Bid
Johnson City, TN

36-Inch Sanitary Sewer Interceptor Rehab
Infrastructure
Results
$7,963,300 CJ est. value
Sevierville, TN 37862

Last Updated 07/21/2023 02:43 PM
Project Title

2021 Harriman CDBG Water System Improvements

Physical Address View project details and contacts
City, State (County) Harriman, TN 37748   (Roane County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $1,145,110 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

A. The work described in these Contract Documents consists of furnishing, delivering, and installing all materials, equipment, and products for the construction of the 2021 Harriman CDBG Water System Improvements, Contract No. 14980 project, as specified in these contract documents, specifications, and as shown on the Drawings. B. Furnish all materials, power, equipment, tools, labor, transportation, and other items necessary or convenient to the Contractor for the installation of the equipment, materials, and products specified or described in these Contract Documents and for the completion of all work to be performed by the Contractor as specified herein. The project consists of installation of approximately 9,300 linear feet of waterline, services lines, and other appurtenances.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents