Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Design
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

Dog River Pipeline Replacement
Infrastructure
Bidding
The Dalles, OR

Powell Road Improvements - 2022
Infrastructure
Bidding
$880,000 est. value
Milton-Freewater, OR 97862

OR58 (018) MP35 Paving (Oakridge)
Infrastructure
Post-Bid
Oakridge, OR

Granite Hill Road Reconstruction
Alteration
Post-Bid
$7,000,000 to $10,000,000 est. value
Sumpter, OR

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Canby And East Streets Watermain Replacement
Infrastructure, Alteration
Results
$450,000 to $500,000 est. value
Klamath Falls, OR 97625

Shitike Creek Water Main Crossing - Warm Springs
Infrastructure
Design
$1,000,000 to $5,000,000 est. value
Warm Springs, OR

Cold Plane Pavement Removal and Hot Asphalt Paving
Infrastructure
Bidding
$300,000 est. value
Warm Springs, OR

Clinton Avenue Parking Lot at Peterson Elementary School
Infrastructure
Post-Bid
Klamath Falls, OR 97603

2021 Sidewalk Safety Program
Infrastructure
Results
$146,720 est. value
Corvallis, OR 97333

Cities of Cottage Grove and Creswell Road Chip Seal Projects
Infrastructure
Bidding
$200,000 est. value
Cottage Grove, OR

Juniper Ridge Public Works Campus Project
Alteration
Post-Bid
Bend, OR

US97: OR58 - California Border Project the Dalles-California Hwy Tom Feeley, Pm
Infrastructure
Results
OR

Reported 04/29/2022 12:00 AM
Project Title

East Main Street Improvement Project

Physical Address View project details and contacts
City, State (County) Carlton, OR 97111   (Yamhill County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value $891,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of two schedules: o Schedule 1 - East Main Street Improvements: o Install 2" level 2 asphalt pavement inlay for approximately 1,290 square yards of public street; 2,820 square feet of concrete sidewalk replacement; 6 new concrete driveway aprons totaling approximately 1,580 square feet; 460 linear feet of concrete curb and gutter; and install 1 new ADA curb ramp on East Main Street. o Install 2" level 2 asphalt pavement and base for approximately 320 square yards of public street on East Main Street. o Adjust utility structure rims to finish grade of new street. o Install 1,950 linear feet of 3" diameter PVC conduit for future utilities under new sidewalks. o Schedule 2 - North First Street Water Main: o Install 310 linear feet of 8" diameter ductile iron water main and fittings. o Install hot tap connection to existing water main. o Install three new water service connections. o Patch pavement following installation of water main and services.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents