Similar Projects
Wastewater Treatment Plant Rehabilitation Phase II - City of Casper
Renovation
Conception
$3,000,000 CJ est. value
Casper, WY 82601

Wastewater Treatment Plant Concrete Repairs - City of Casper
Renovation
Conception
$1,200,000 CJ est. value
Casper, WY 82601

Commercial Kitchen Equipment
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Big Horn National Forest Wide Tree Clearing
Term Contract
Sub-Bidding
$500,000 CJ est. value
Sheridan, WY 82801

Bar Nunn Streetscape Revitalization Plan
Term Contract
Post-Bid
Casper, WY

Emergency Operations Plan Development
Term Contract
Post-Bid
WY

Waste Water Treatment Plant Digester #2 Cleaning
Renovation
Results
$80,000 est. value
Casper, WY 82609

Wastewater Treatment Plant Motor Control Center - City of Casper
Renovation
Conception
$3,000,000 CJ est. value
Casper, WY 82601

Annual Load Bank Testing and Preventative Maintenance
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Recycling Center Sort System
Term Contract
Post-Bid
WY

Water Treatment Plant Pipe Lining - WTT-CP24-001 - City of Laramie
Renovation, Infrastructure
Conception
$550,000 CJ est. value
Laramie, WY 82070

Inspection and Maintenance of a Muffin Monster wastewater Grinder
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Science Initiative Building Specialty Moving
Term Contract
Post-Bid
Laramie, WY 82071

Mullen Fire Restoration Project on State Lands
Term Contract
Sub-Bidding
Cheyenne, WY 82001

Y--Yell 310402 Rehabilitate/Replace Canyon & Grant Village Wastewater Treatment System, Old Faithful Water Treatment System
Renovation
Post-Bid
$50,000,000 to $90,000,000 est. value
Yellowstone National Park, WY

Last Updated 08/08/2022 12:34 AM
Project Title

Wastewater Treatment Plant - Ditch Cleaning

Physical Address View project details and contacts
City, State (County) Laramie, WY 82072   (Albany County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Service/Term Contracts, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $304,371 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Dewatering, removing and placement of sludge and foreign material in onsite drying beds, and replacing the air diffuser membranes in Basin 1. An add alternate to complete the same operations for Basin 2, identical to Basin 1, shall be included.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents