Similar Projects
Main Pump Station Upgrade Project
New Construction
Bidding
NY

AOP Treatment System
Addition
Bidding
Farmingdale, Islip, NY 11735

Snowmaking Prefabricated Pump Station
Post-Bid
NY

Emerson Park Sewer Station Repair
Post-Bid
Auburn, NY 13021

CM Services - Riverfront Pump Station
Term Contract
Results
Albany, NY 12242

GC Phase 2 Water Supply, Contract 3: New Water Pump Stations
Term Contract
Results
Batavia, NY 14020

Bay Park Conveyance
Term Contract
Construction
Less than $439,000,000 est. value
NY

I-481 and S.R. Industrial Sewer Corridor Project
New Construction
Construction
DeWitt, NY 13057

Borden Avenue Pump Station Upgrade
New Construction
Bidding
Long Island City, NY

Gorge Pump Station Rehabilitation Niagara Falls Water Board
Post-Bid
Niagara Falls, NY 14304

Hagan Town Pump Station Abandonment and Replacement
Results
$543,288 est. value
Poughkeepsie, NY 12603

Harriman Farms Pump Station Replacement
Post-Bid
Harriman, NY 10926

Sleepy Hollow Water District Improvements and Extension No 1
Results
Chittenango, NY 13037

Williams Road Pump Station Rehabilitation
Post-Bid
Niagara Falls, NY 14304

Pump Station Upgrade
Results
Less than $627,800 est. value
Hudson, NY 12534

Last Updated 09/09/2021 10:02 AM
Project Title

Phase 2 Water Supply - Contract 5B - Sodium Hypochlorite Injection Buildings

Physical Address View project details and contacts
City, State (County) Elba, Oakfield, NY   (Genesee County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of three (3) separate prefabricated chlorine booster buildings at the existing Village of Oakfield Water Storage Tank, Town of Elba Water Storage Tank, and Dodgeson Road Pump Station sites within Genesee County. The scope of work at each site involves the installation of a concrete pad, fiberglass building enclosure, chemical feed equipment, a metering and injection manhole, miscellaneous site work, and related electrical and control work.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents