Similar Projects
Conservatory Roof and Fire Sprinkler Replacement
Post-Bid
Kure Beach, NC

East River Phase 1 Project
Post-Bid
Clayton, NC 27527

Automatic Meter Reading System Project
Results
NC

Area 1 Elementary School Off-Site Utilities
Results
Carthage, NC

Maple Street/Merritt Street Water Improvements Project
Post-Bid
Mount Airy, NC 27030

2016 Water System Improvements
Results
Bakersville, NC

Building 2000 Fire Alarm System Replacement
Post-Bid
Concord, NC 28146

Old Mill Road Force Main
Results
NC

Northwest Water Treatment Plant - Concentrate Discharge Pipeline
Post-Bid
Less than $7,000,000 est. value
Leland, NC 28451

Jericho Church Road Water Line
Results
$40,000 est. value
Mocksville, NC

Carriage House Fire Alarm System
Post-Bid
Raleigh, NC 27605

Colington Road - SR 1217 Water Main Improvements Project
Results
Less than $600,000 est. value
Kill Devil Hills, NC 27948

Construction of the Fire Flow Improvements and Water Main Replacement Phase 3
Post-Bid
Roanoke Rapids, NC 27870

Old Highway 74 Waterline Construction
Results
Wingate, NC

CM at Risk Services for Kannapolis Water Main and Sanitary Sewer Service Extension
Post-Bid
Kannapolis, NC

Last Updated 04/27/2021 04:12 PM
Project Title

Booster Pump Station and Fire Water Service Upgrade

Physical Address View project details and contacts
City, State (County) NC 28659   (Wilkes County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Fire Protection, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the Project includes the construction of a new 2,500 gallon per minute packaged fire water booster pump station and 125,000-gallon ground-level, welded steel water storage tank along with associated site, piping and valving, electrical and controls work at the existing Wilkes County Airport fire water tank and booster pump station site. An additive alternate bid to the base contract described above will be to construct a 150,000-gallon (useable volume) welded steel water storage tank in lieu of the 125,000-gallon tank. The Project also includes the installation of approximately 1750 LF of a new parallel 8-inch PVC C900 fire water service (FWS) pipe that will connect to an existing 8-inch FWS pipe and increases to a 10-inch PVC C900 FWS before connecting to an existing 10-inch FWS pipe that will serve a new aircraft hangar fire suppression system . This work includes but is not limited to site preparation; implementation of erosion control measures; design and construction of the tank and packaged booster pump station foundations. The Work includes all items as indicated elsewhere in the Specifications and Drawings.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents