Similar Projects
Pronto Freight Ways - Addition
Addition - 16,500 SF
Conception
Taylor, MI 48180

Madison Avenue Building
New Construction, Demolition - 60,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Grand Rapids, MI 49507

Specialty Tooling Systems Expansion
Addition - 54,000 SF
Design
Walker, MI 49534

Alpha Court - Industrial Building
New Construction - 39,958 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Wixom, MI 48393

DTE Energy Eastman Boiler House
New Construction
Post-Bid
Trenton, MI 48034

Magna International - Expansion and Renovation
Addition - 5,000 SF
Post-Bid
$35,000,000 est. value
Highland Park, MI 48203

Motion Dynamics Manufacturing
Addition - 28,000 SF
Construction
$3,750,000 est. value
Fruitport, MI 49415

FedEx Ground Build to Suit
New Construction - 320,988 SF
Construction
$21,404,147 est. value
Kalamazoo, MI 49002

Asahi Kasei Plastics
Renovation
Pending Verification
Fowlerville, MI 48836

Life Sciences & Research Business Park
Pending Verification
Ann Arbor, MI 48108

Hydrolico - New Building
New Construction - 20,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Walker, MI 49544

Charlotte Cabinets - Addition
Addition
Design
Charlotte, MI 48813

AAM - Three Rivers Dock Expansions
Renovation, Addition
Post-Bid
Three Rivers, MI 49093

American Mitsuba Corporation Addition
Addition, Demolition - 6,840 SF
Construction
Mount Pleasant, MI 48858

Summit View Townhomes and Villas
New Construction, Demolition
Pending Verification
Milford, MI 48381

Last Updated 12/07/2020 09:54 AM
Project Title

Kroger Fullfilment Center

Physical Address View project details and contacts
City, State (County) Romulus, MI   (Wayne County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Manufacturing/Processing Plant
Contracting Method Qualified Bidding.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Industrial Warehouse, 1 Story Above Grade, 130,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents