Similar Projects
Chiller Replacement for Andrews High School
Alteration
Bidding
High Point, NC 27265

Endimal Chemical Feed
Infrastructure, Alteration
Bidding
$120,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

HVAC Water Treatment Service
Term Contract
Results
Jamestown, NC

HVAC Replacement - Carl Chavis YMCA
Results
High Point, NC

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

HVAC Electric Motor and Pump Repair Services
Results
Greensboro, NC 27401

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

Split Dx System Replacement And Installation - 21
Results
Greensboro, NC

Air Conditioning System Trainer With H-Block
Post-Bid
Greensboro, NC 27407

Cooling Tower Replacement and Installation at Bryan Building
Results
Greensboro, NC 27412

Elm Towers and Morehead Courts HVAC Renovation
Alteration
Post-Bid
High Point, NC

NCA and T - Fume Hood Replacements
Results
$500,000 est. value
Greensboro, NC

Hood Cleaning Summer 2021
Alteration
Post-Bid
Greensboro, NC

Last Updated 12/21/2021 10:34 AM
Project Title

Pleasant Garden Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Pleasant Garden, NC 27313   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work in the project follows: 1. The existing cooling tower will be removed and replaced. 2. A cooling tower with VSD fans will be installed at the same location. 3. One existing Condenser Pump and Building Pump will be replaced with new pumps with VSD. 4. New piping and HX will be installed in mechanical room. 5. DDC controls will be installed to accomplish temperature control for the water source heat pump loop. 6. Electrical will reuse existing power with some modifications.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents