Similar Projects
Wastewater Treatment Plant Construction
New Construction
Design
Sterling, IL

Aerobic Digester Conversion
Renovation
Bidding
La Salle, IL 61301

Womens Locker Room Facilities
Renovation
Bidding
Highland Park, Waukegan, IL 60087

Wastewater Treatment Facility Controls Upgrade
Post-Bid
Davis Junction, IL

Sewage Treatment Plant
Post-Bid
Hudson, IL 61748

West Side Water Reclamation Facility 2020 Phase III Expansion
Results
$16,000,000 to $20,000,000 est. value
Saint Charles, IL 60175

Wastewater Treatment Plant Improvements WWTP #1 Phase D
Results
East Peoria, IL 61611

Replacement of the Existing Candle Stick Waste Gas Burner
Renovation
Bidding
$700,000 est. value
Libertyville, IL 60048

Bar Screen Replacement Project
Renovation
Post-Bid
Toluca, IL

WWTP and 10th Street Pump Station Improvements
Results
Less than $530,000 est. value
Cairo, IL 62914

Wastewater Treatment Facility UV Disinfection
Infrastructure
Post-Bid
Metropolis, IL

Water System Disinfection Conversion
Results
Northbrook, IL 60062

Electric Motor Rehabilitation
Renovation
Post-Bid
$380,000 est. value
Chicago, IL

Wastewater Treatment Facility Improvements
Results
Less than $7,120,000 est. value
Stockton, IL

Repair and Replacement of Certain Portions of the Sludge De-Watering Building
Renovation
Post-Bid
$200,000 est. value
Chillicothe, IL

Reported 04/06/2022 12:00 AM
Project Title

Water Reclamation Plant Headworks Building Improvement

Physical Address View project details and contacts
City, State (County) Wilmington, IL 60481   (Will County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Includes the installation of 9? fiberglass Parshall flume and an ultra-sonic open channel flow meter.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents