Similar Projects
The Settlement
New Construction
Conception
Simpsonville, SC

Southern Commons - Master Plan
New Construction
Conception
Cayce, SC 29172

Long Savannah - Master Plan
New Construction
Design
Charleston, SC

Woods Crossing
New Construction - 8,400 SF
Design
$8,000,000 est. value
Greenville, SC

Catawba Park - Phase 1
New Construction
Bidding
$10,000,000 est. value
Tega Cay, SC

Brantley Park Phase I
New Construction
Bidding
Charleston, SC 29412

DB Walker Park Improvements
Post-Bid
Less than $125,000 est. value
Anderson, SC 29621

Repairs to Sand Volleyball Court
Post-Bid
Marion, SC 29571

Flat Stack Trail - Phase I
Results
$100,000 to $200,000 est. value
Lockhart, SC

Newberry High School Track and Field
Results
Newberry, SC 29108

St. Andrew By-The-Sea United Methodist Church Campus
New Construction
Construction
$755,000 est. value
Bluffton, SC 29910

The Waterfront
New Construction
Construction
Daniel Island, SC

Cornerstone
New Construction
Conception
Anderson, SC 29625

The Exchange at Old Town Depot
New Construction - 45,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Rock Hill, SC

District-Wide Playground Surfacing Material And Mulch
Renovation
Bidding
SC

Reported 03/23/2021 12:00 AM
Project Title

Gymnasium Bleacher Replacement – Term Contract

Physical Address View project details and contacts
City, State (County) Green Sea, Loris, Myrtle Beach, SC 29588   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Work includes removal and disposal of existing gym bleachers, protection of existing gymnasium floor, the manufacture, delivery, and installation of an electrically operated telescopic seating system of multiple-tiered seating rows (wall attached, typically) comprising of seat, deck components, understructure that permits closing without requiring dismantling, into a nested configuration for storing or for moving purposes in accordance with applicable codes, the following specifications. Installation is anticipated to be during the summer months while school is not in session (June through August). Install Sheridan Seating Motorized Telescopic Bleachers Model M200, or an approved equal, to replace existing bleachers as specified. All bleachers shall have ¾” plywood decking and shall have 10 GA structural tube steel posts at a minimum. Install per the manufacturer’s specifications. The All-inclusive bid per lot shall include all materials, equipment, and labor to properly removed, dispose, and install new bleachers per specifications.

Details

Park/Playground, New Construction.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents