Similar Projects
Seaford Inn
Renovation
Pending Verification
Seaford, DE 19973

Springhill Suites
New Construction
Design
Frederica, DE 19946

New Castle Hotel
New Construction
Design
New Castle, DE 19720

Hotel and Restaurant
New Construction - 8,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
DE

Fairfax Campus Mixed Use
New Construction
Conception
Wilmington, DE 19800

Home2 Suites Hotel
New Construction, Renovation, Demolition - 73,894 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Newark, DE 19713

The Atlantic Crown Hotel and Retreat
New Construction - 15,000 SF
Construction
Rehoboth, DE 19971

Bellhaven Hotel
New Construction - 116,926 SF
Design
$6,000,000 est. value
Rehoboth Beach, DE 19971

Cambria Hotel
New Construction - 111,144 SF
Pending Verification
DE

Cool Springs
New Construction - 229,100 SF
Design
$10,000,000 CJ est. value
DE 19968

Georgetown Hotel and Restaurant
New Construction - 8,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Georgetown, DE

Georgetown Village - Phase I
New Construction
Pending Verification
Georgetown, DE

Rehoboth Grand Hotel
New Construction
Design
Rehoboth Beach, DE 19971

Reported 06/15/2022 09:29 AM
Project Title

Holiday Inn Express At Georgetown Villages Phase 1

Physical Address View project details and contacts
City, State (County) Georgetown, DE 19947   (Sussex County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected February 2023
Bids Due View project details and contacts
Estimated Value $4,900,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New construction of a hospitality development in Georgetown, Delaware. Conceptual plans call for the construction of a 16,000-square-foot, four-story above grade, 84-room hospitality development. As of June 2022, the owner has submitted zoning amendment plans to the city of Georgetown. Plans have yet to be finalized. Information regarding architect or contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin 2023. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Hotel/Motel, 4 Stories Above Grade, 16,000 SF New Construction, 84 Unit(s).
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents