Similar Projects
Central Elementary School - HVAC, Electrical and Fire Alarm Upgrades
Bidding
Hillsborough, NC 27278

Guaranteed Energy Savings (Performance) Contracting Services
Alteration
Bidding
$2,000,000 to $2,500,000 est. value
Clinton, NC 28328

Cooling Tower Replacement
Post-Bid
Raleigh, NC 27610

DPS - Polk Youth Institution - Chiller and Cooling Tower Replacement
Post-Bid
Butner, NC 27509

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

Install 20 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

WPD Head-Quarters Chiller Replacement and Evidence Room
Alteration
Bidding
Wilmington, NC

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Compressor Rebuild on Chiller 1 and Chiller 2 - Scotland Correctional Institution
Alteration
Bidding
Laurinburg, NC 28352

Replace HVAC Equipment/Systems - Stanly County
Post-Bid
$1,000,000 to $5,000,000 est. value
NC

Dispatch HVAC Modifications
Results
Less than $84,272 est. value
Jacksonville, NC

Cooling Tower Water Treatment Program - 21
Term Contract
Bidding
Greensboro, NC 27412

Replace HVAC Equipment/Systems - Charlotte
Post-Bid
$1,000,000 to $5,000,000 est. value
Charlotte, NC

Reported 07/01/2021 12:00 AM
Project Title

Prospect Elementary School-Hvac Unit Replacement

Physical Address View project details and contacts
City, State (County) Monroe, NC 28112   (Union County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall replace the existing Trane Model TTA180B300FA, Serial No. 4154N4LAD with a new 15 Ton Dual Circuit outdoor unit and matching indoor coil with TXV. Provide additional materials and workmanship as needed for a turnkey project including, but not limited to duct work. Provide factory start up and ensure unit is operating to full capacity. All equipment, materials are to be new with full manufacturer’s warranty. Contractor shall provide a minimum of 1 year warranty on workmanship.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents