Similar Projects
RFP - Quality Control Engineering Services for Construction of College of Law School Expansion and Renovation
Term Contract
Bidding
Laramie, WY 82071

RFP Design - DMS HVAC
Renovation
Bidding
$200,000 CJ est. value
Laramie, WY 82070

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFQ - Energy Innovation Center Building Soil Stabilization
Infrastructure
Bidding
$198,733 CJ est. value
Laramie, WY 82072

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

D/B - Velma Linford Gym Floor Improvements
Alteration
Results
Laramie, WY 82070

Architect-Engineering Services to Support The Us. Air Force and AFECE Environmental Program Worldwide "AE ES 2022"
Term Contract
Post-Bid

Engineering Services - Oasis Diversion
Infrastructure
Post-Bid
$1,190,000 est. value
Laramie, WY

Design - Project Design Services for Velma Linford Elementary School and Laramie Middle School Mechanical System
Renovation
Post-Bid
$3,808,777 est. value
Laramie, WY

Street PCI Evaluation and Sys Implement
Infrastructure
Post-Bid
Laramie, WY

RFQ Design - Laramie Research Extension Center Feed Mill Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$16,100,000 CJ est. value
Laramie, WY 82070

RFQ Engineering - Harney Street Enhancements - Clark Street Lighting
Infrastructure
Post-Bid
$300,000 CJ est. value
Laramie, WY 82070

Last Updated 05/31/2023 06:05 PM
Project Title

High Bay Research Facility Geomechanics Lab - University of Wyoming

Physical Address View project details and contacts
City, State (County) Laramie, WY 82071   (Albany County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Construction complete as of April 2023 , Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 31, 2023, this project bid for a contractors and all bids were rejected. Construction was done by owner in-house staff and is complete. *The closed solicitation has been included below for reference: Project Description: Create a new, enclosed research laboratory with an area of approximately 1800 sqft within existing Lab 188. Scope to include: mechanical systems with humidity control, electrical services consistent with other labs in the building with connection to existing generators and UPS. Alternates include: process chilled water connections, Starline overhead electrical service, and fume hoods. The estimated project completion date: April 30, 2023. The method of contractor selection has not been determined at this time

Details

1,800 SF.
Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents