Similar Projects
Lighthouse Instruments
New Construction
Conception
VA

Microsoft Data Centers Phase IA
New Construction - 500,000 SF
Conception
$200,000,000 est. value
Leesburg, VA 20175

Landmark Mall Redevelopment - Master Plan
New Construction, Demolition - 750,000 SF
Design
Alexandria, VA 22304

Madison County Rescue Squad
New Construction - 30,000 SF
Design
$5,000,000 est. value
Madison, VA 22727

Gilbert Street Mixed-Use Development
New Construction, Demolition - 180,000 SF
Sub-Bidding
$56,000,000 est. value
Blacksburg, VA

Common Floor & Restroom Interior Renovation
Renovation
Post-Bid
Falls Church, VA 22046

Project Freight Train
New Construction
Post-Bid
Boydton, VA 23917

Repair Interior/Exterior A Staff ACC, Facility 602, JBLE-Langley, VA
Renovation - 108,000 SF
Results
$1,000,000 to $5,000,000 est. value
Hampton, VA

River Club Build-Out
Build-Out
Results
Fredericksburg, VA 22401

Crossroads Station
New Construction - 1,144,210 SF
Construction
$10,000,000 CJ est. value
Fredericksburg, VA 22408

Springfield Metro Center - Phase I
New Construction - 622,000 SF
Construction
$60,000,000 to $70,000,000 est. value
Springfield, VA 22003

Yext
Build-Out - 42,500 SF
Pending Verification
Arlington, VA 22209

Pickett Place
New Construction, Demolition - 394,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA

The Shops At Arcola
New Construction - 820,000 SF
Design
$10,000,000 CJ est. value
Ashburn, Sterling, VA 20166

Carter Machinery
New Construction, Addition - 19,811 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Mechanicsville, VA 23116

Last Updated 02/21/2019 02:15 PM
Project Title

Facebook Data Center - Phase II

Physical Address View project details and contacts
City, State (County) Sandston, VA   (Henrico County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method General Contractor to Subcontract.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $750,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description
Details 1,500,000 SF - 1 Office, 500,000 SF New Construction, 1 Office, 500,000 SF New Construction, 1 Office, 500,000 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents