Similar Projects
Sabal Palm Village at Flagler Trail
New Construction, Build-Out - 500,000 SF
Conception
$10,000,000 CJ est. value
Miami, FL

Southwest 127th Avenue Mixed-Use Development
New Construction - 45,302 SF
Conception
Miami, FL 33177

Brownsville Transit Village Phase 5
New Construction, Infrastructure - 99,854 SF
Design
$45,000,000 CJ est. value
Miami, FL 33142

M-Tower
New Construction, Infrastructure, Renovation - 10,531 SF
Design
$170,000,000 CJ est. value
Miami, FL 33130

42 Pine Street Apartments
New Construction - 168,691 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Miami Beach, FL 33140

Publix #1770 - Riviera Plaza / Coral Gables
New Construction, Infrastructure - 52,363 SF
Post-Bid
$10,000,000 CJ est. value
Coral Gables, FL 33146

Century Towne Place
New Construction - 47,000 SF
Construction
$10,000,000 CJ est. value
Doral, FL

Northwood Development
New Construction, Build-Out - 112,800 SF
Construction
$10,000,000 CJ est. value
Bay Harbor Islands, Indian Creek, FL 33154

Alton Bay Condominium Tower / Miami Beach
New Construction, Infrastructure - 197,780 SF
Pending Verification
$10,000,000 CJ est. value
Miami Beach, FL 33140

Beckham's Miami Freedom Park - United Major League Soccer Stadium
New Construction, Infrastructure - 1,000,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Miami, FL 33125

River Rapids Apartments
New Construction - 906,716 SF
Conception
$250,000,000 est. value
Miami, FL 33125

Mandarin Park
New Construction, Infrastructure - 87,500 SF
Design
$75,000,000 CJ est. value
Homestead, FL 33033

Legacy Hotel & Residences
New Construction - 1,013,840 SF
Post-Bid
Miami, FL 33132

Eighteen Sunset
New Construction, Build-Out - 55,213 SF
Construction
Less than $40,000,000 est. value
Miami Beach, FL 33139

Collins Avenue Condominiums
Demolition, New Construction, Infrastructure, Renovation
Pending Verification
$20,700,000 CJ est. value
Surfside, FL 33154

Last Updated 02/20/2023 05:12 PM
Project Title

Micro Center at Mall of the Americas / Miami

Physical Address View project details and contacts
City, State (County) Miami, FL 33144   (Miami-Dade County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Negotiated General Contractor To Subcontract, Bids by Invitation
Project Status All Sub-Bids Received, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,600,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the Façade and Tenant Improvements of an approximately 37,148 SF Micro Center retail store and associated sitework located at 7795 W Flagler Street in Miami, FL. The scope of work includes but is not limited to: Sitework and Site Utilities, Landscape and Irrigation, Fencing and Gates, Selective Demolition, Shorting, Concrete, Polished Concrete, Masonry, Structural and Misc. Steel, Stainless Steel, Rough Carpentry, Finish Carpentry, Nichiha, Stonewood Architectural Panels, Roofing, Stucco and EIFS, Caulking and Waterproofing, Doors Frames and HW, Impact Traffic Doors, Overhead Doors, Storefront, Revolving Doors, Automatic Entrance Doors, Metal Framing and Drywall, Acoustical Ceiling, Flooring, Painting and Wallcoverings, DIV 10, Pre-Engineered Aluminum Canopies, Bahama Shutters, Fire Sprinkler, Plumbing, HVAC, Electrical, and Fire Alarm.

Details

37,148 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents