Similar Projects
North Water Reclamation Facility Storage Expansion - 6110880 - Manatee County
Addition, Demolition, Infrastructure
Conception
$453,000 CJ est. value
Palmetto, FL 34221

Lakeside Plaza
Demolition, New Construction, Infrastructure - 66,738 SF
Conception
$11,000,000 CJ est. value
Bradenton, FL 34207

Reimagining Pine Avenue Safety Improvement Project - City of Anna Maria
Infrastructure
Design
$1,360,000 CJ est. value
Anna Maria, FL 34216

Reimagining Pine Avenue Safety Improvement Project - City of Anna Maria
Infrastructure
Design
$1,360,000 CJ est. value
Anna Maria, FL 34216

FDOT SCOP FY22 Wilson Avenue Road Reconstruction
Infrastructure
Bidding
$410,000 CJ est. value
Bronson, FL 32621

FDOT SCOP FY22 Wilson Avenue Road Reconstruction
Infrastructure
Bidding
$410,000 CJ est. value
Bronson, FL 32621

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Low Bid Design Build I-275 At Skyway Attenuation
Infrastructure
Results
FL

66th Street Court East/64th Street Court East at Sr 64 Intersection Improvements
Infrastructure
Results
$957,730 est. value
Bradenton, FL 34208

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Lakewood Ranch Multifamily Phase 2
New Construction, Infrastructure
Pending Verification
$117,000,000 CJ est. value
Bradenton, FL 34211

Lakewood Ranch Multifamily Phase 2
New Construction, Infrastructure
Pending Verification
$117,000,000 CJ est. value
Bradenton, FL 34211

Harbor Hills Water Main Replacment - 6104270 - Manatee County
Infrastructure
Conception
$1,449,000 CJ est. value
Bradenton, FL 34209

Last Updated 05/15/2023 12:47 PM
Project Title

RFP Engineering - SR 55 (US 19) From Terra Ceia Rd to I-275

Physical Address View project details and contacts
City, State (County) Inglis, FL 34449   (Levy County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $15,847,904 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 15, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 01 Selection Method : Letter of Response and Abbreviated Technical Proposal Professional Liability Insurance : $250,000.00 SR 55 (US 19) From Terra Ceia Rd to I-275 Financial Management Numbers : 44737913201 44737913202 44912013202 Financial Management Numbers : 44923213201 44923213202 Financial Management Number(s) 449120 1 32 01; 449120 1 32 02; 447379 1 32 01; 447379 1 32 02 Longlist Date/Time 5/10/2022 06:00 pm Shortlist Selection Date/Time 5/18/2022 12:00 am Phase II Submittal Deadline Date/Time 6/02/2022 12:30 am Final Selection Date/Time 6/14/2022 07:00 pm Negotiations Period Begin Date 6/22/2022 Negotiations Period Ending Date 7/30/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 55 (US 19) From Terra Ceia Rd to I-275

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents