Similar Projects
Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Nashville District Bank Stabilization MATOC
Infrastructure
Design
$250,000 to $3,500,000 est. value
Nashville, TN

Depot Park Landscape/Drainage
Infrastructure
Bidding
Erlanger, KY 41018

112 River Road Slope Repair
Infrastructure
Bidding
Paintsville, KY 41240

Shoreline Erosion Control Green River Lock and Dam #1
Post-Bid
$25,000 to $100,000 est. value
Reed, KY

Buffalo Lake Restoration
Post-Bid
Elizabethtown, KY

Cardinal Hill Drainage
Results
$50,001 to $100,000 est. value
Louisville, KY 40202

5029 Lea Ann Way Bank Repair
Results
$50,000 to $100,000 est. value
Louisville, KY 40203

Williams Road Culvert Rehabilitation
Infrastructure
Bidding
Hebron, KY 41048

Middlesboro, KY Channel Clearing
Post-Bid
$1,000,000 to $5,000,000 est. value
Middlesborough, KY

8010 Mimosa Drive Bank Repair
Results
$50,000 to $100,000 est. value
Louisville, KY 40203

Wetherby Park Improvement and Drainage
Infrastructure
Bidding
Middletown, KY

8018 South Third Street Road - Drainage Improvement and Building Underpinning
Post-Bid
Louisville, KY 40214

Vista Greens Bank Repair
Results
$100,000 to $120,000 est. value
Louisville, KY 40203

PreQualifications for Crescent Hill Discharge System Improvements
Post-Bid
Louisville, KY

Last Updated 01/18/2022 02:58 PM
Project Title

River Water Intrusion Groups 2 and 3 Improvements Package B

Physical Address View project details and contacts
City, State (County) (Campbell, Kenton Counties)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the construction of river water backflow prevention devices at nine (9) separate sites along the Ohio and Licking Rivers.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents