Similar Projects
Trinity Storm Water Park Phase II
Bidding
$8,221,000 to $11,714,000 est. value
Evansville, IN

2021 Street and Sewer Materials
Bidding
South Bend, IN

Collection System Improvements
Post-Bid
New Palestine, IN 46163

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Marion Sewer CIPP- City Wide Sewer Lining
Bidding
Marion, IN

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Underground Facility Locating Services
Term Contract
Post-Bid
Anderson, IN 46011

2020 Sanitary Sewer Extensions-Contract B
Results
Decatur, IN 46733

Reported 02/10/2021 12:00 AM
Project Title

Market Survey/Sources Sought for Construction Work at City of Portage Sewer Interceptor Rehabilitation, In Porter County, Portage, Indiana

Physical Address View project details and contacts
City, State (County) Portage, IN   (Porter County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will be required to provide service to inceptor rehabilitation extending from Stone Avenue in the south up to Central Avenue in the north. This section of interceptor is approximately 4,600 feet in length. It includes 30-inch and 36-inch diameter RCP pipe along with two (2) 20-inch diameter siphon pipes (between MH74-38 and 74-36). The siphon is restricting flow in the interceptor, so a third pipe will be added. The manholes within this stretch of interceptor will also be rehabilitated. Some manhole rim elevations are below the 100-year floodplain elevation and will be raised as part of this project as well.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents