Similar Projects
U-Haul Valley Hi
New Construction, Renovation - 85,000 SF
Construction
$7,324,770 est. value
Colorado Springs, CO 80910

In-N-Out Burger Distribution Center & Office Building
New Construction - 197,900 SF
Construction
$10,000,000 est. value
Colorado Springs, CO

Transit Campus Expansion Bus Storage Construction
New Construction - 71,218 SF
Results
$7,000,000 to $13,000,000 est. value
Colorado Springs, CO 80903

Zeppelin 3 and 4
New Construction - 240,240 SF
Construction
$9,722,120 est. value
Colorado Springs, CO 80916

Centralized Water Treatment Project
Construction
Colorado Springs, CO

UPS Parcel Distribution Facility
New Construction - 98,291 SF
Construction
Monument, CO

Construction of a New Metal Building
New Construction
Post-Bid
Fountain, CO

Water Treatment Plant 3/9 Modifications
New Construction
Results
Monument, CO 80132

Coca Cola Bottler Building
New Construction - 145,000 SF
Construction
$21,700,000 est. value
Colorado Springs, CO 80916

Furnish and Install Drake Tngg Pre-Engineered Shop-Fabricated Metal Building
New Construction
Results
Colorado Springs, CO 80903

Monument Industrial
New Construction - 136,000 SF
Post-Bid
Monument, CO 80132

Monument Plowport and Wash Bay
New Construction
Results
$250,000 est. value
Monument, CO

Warehouse and Munitions Storage Facility
New Construction, Renovation - 14,000 SF
Design
$5,000,000 to $10,000,000 est. value
Fort Carson, CO 80913

Eagle Rock Distribution
New Construction - 262,500 SF
Design
$10,000,000 CJ est. value
Monument, CO 80132

FLY 026 New Snow Removal Equipment Building
Renovation
Bidding
Peyton, CO

Reported 04/05/2022 12:43 PM
Project Title

Tactical Equipment Maintenance Facility, Fort Carson

Physical Address View project details and contacts
City, State (County) Colorado Springs, CO 80902   (El Paso County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value $10,000,000 to $25,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: This is a fully designed project. Construct a SOF Tactical Equipment Maintenance Facility (TEMF). The maintenance facility will include oil storage building, vehicle component storage building, and organizational equipment parking. The TEMF shall provide an administration and shop control office, equipment maintenance systems office, weapons vault, shop stock listing room, repair exchange/tech support room, tool issuing/storage room, restrooms, janitorial closet, break/training/conference room, telecommunications room, utility rooms, organizational storage bays, maintenance and repair areas, fluid distribution room, and compressor room. The project shall provide a standalone prefabricated POL/hazardous waste storage building. The equipment maintenance facilities will include bridge cranes, maintenance bays including pits and vehicle lifts, administrative space, and tool storage areas. Construction consists of concrete foundation and floor slab with metal frame structure. Built-in building systems will include fire alarm/mass notification, fire suppression, energy management control, telephone and advanced unclassified and classified communications networks, cable TV, intrusion detection, closed circuit surveillance, and electronic access control systems, and hardened protected distribution system. Department of Defense principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development features will be included in the design and construction of this project as appropriate. Supporting facilities include site preparation, utilities (electrical, water, gas, sanitary sewer, chilled water, and information systems distribution), lighting, vehicle parking, access drives, curb and gutter, sidewalks, storm drainage, landscaping, roads, and other site improvements. Building feature include special foundations required for the expensive soils at Fort Carson. Appropriate cybersecurity measures will be applied to the facility-related control systems in accordance with current Department of Defense criteria. Access for persons with disabilities will be provided. Comprehensive interior design, design of electronic security, and audio-visual services are included.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents