Similar Projects
Utilities - SH 132
Infrastructure
Design
$500,000 est. value

Grade, Drain, Bridge and Surface
Infrastructure
Design
$40,000,000 CJ est. value
Tahlequah, OK 74464

RFP Design - Site Development - Pre-Construction Design Phase
Infrastructure
Bidding
$50,000 CJ est. value
Tahlequah, OK 74464

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Wildwood Waterline Installation
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Hulbert, OK 74441

Ross Street Improvements and Cedar Avenue Improvements
Infrastructure
Results
$2,271,647 CJ est. value
Tahlequah, OK 74464

Ross Street Improvements and Cedar Avenue Improvements
Infrastructure
Results
$2,271,647 CJ est. value
Tahlequah, OK 74464

New Hospital - Cherokee Nation
New Construction, Infrastructure
Construction
$400,000,000 CJ est. value
Tahlequah, OK 74464

Mud Valley Road Waterline Relocations
Infrastructure
Construction
$1,465,563 CJ est. value
Tahlequah, OK 74464

Resurface
Infrastructure
Design
$1,000,000 CJ est. value
Tahlequah, OK 74464

Utility Relocation Gate Valves
Infrastructure
Post-Bid

Water Line Relocation
Infrastructure
Results
$411,225 CJ est. value
Tahlequah, OK 74464

Utilities - SH 100
Infrastructure
Design
$2,000,000 CJ est. value
Cookson, OK 74427

Mud Valley Road Natural Gas Line Relocation
Term Contract
Post-Bid
$90,000 CJ est. value
Tahlequah, OK 74464

Resurface (Asphalt) - US-62
Infrastructure
Results
$632,043 CJ est. value
Tahlequah, OK 74464

Last Updated 01/26/2023 11:32 PM
Project Title

Utilities - SH 82

Physical Address View project details and contacts
City, State (County) Tahlequah, OK 74464   (Cherokee County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Sh-82: From Approx 500' N of Sequoyah C/l, N. 6.7 Mi. Ut for 32825(04) As of January 27, 2023, the project is in Final Planning status. Anticipated letting month/year is April, 2023. Length : 6.730 Mi. OKDOT - Utilities - SH 82 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents