Similar Projects
Broadway Field Renovation
New Construction, Infrastructure
Design
$4,600,000 CJ est. value
Seaside, OR 97138

US 26: Little Humbug Creek Bridge
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Seaside, OR 97138

RFQ D/B - Design/Build Highway 30 Retaining Wall at Tongue Point Job Corps Center
Infrastructure
Bidding
$1,000,000 CJ est. value
Astoria, OR 97103

Plympton Creek Pile Removal
Infrastructure
Post-Bid
$300,000 est. value
OR

OR202: Dresden St. To 4th St. (Astoria) Sec.
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Astoria, OR 97103

Mouth of the Columbia River Sand Island Pile Dikes Repair
Infrastructure
Results
$49,037,000 CJ est. value
Astoria, OR 97103

Water Resiliency Project Phase 1 Seismic Improvements
Infrastructure
Results
$807,380 CJ est. value
Cannon Beach, OR 97110

Fairfield Inn by Marriott / Astoria
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Astoria, OR 97103

2021 Bond - Knappa School District
New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Astoria, OR 97103

RFP CM/GC - Broadway Field Renovation
Infrastructure
Bidding
$5,000,000 CJ est. value
Seaside, OR 97138

RFP Construction Manager - Cannon Beach Elementary School Renovation
Infrastructure, Renovation - 13,500 SF
Post-Bid
$700,000 CJ est. value
Cannon Beach, OR 97110

Pavement Management Project 2023
Infrastructure
Results
$325,114 CJ est. value
Warrenton, OR 97146

South Spruce Street Housing / Cannon Beach
New Construction, Infrastructure
Pending Verification
$3,800,000 CJ est. value
Cannon Beach, OR 97110

Warrenton Main Avenue at 9th Street Safe Routes to School
Infrastructure
Bidding
$680,000 CJ est. value
Warrenton, OR 97146

RFQ D/B - Design/Build Construction Services - Knappa School District
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Astoria, OR 97103

Last Updated 10/05/2023 11:24 AM
Project Title

FY 2023-24 Pile Replacement Pier 1 West

Physical Address View project details and contacts
City, State (County) Astoria, OR 97103   (Clatsop County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $380,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 08/16/2023 at 5:00 PM PT All questions must be submitted in writing to Matt McGrath at mmcgrath@portofastoria.com The work for this project consists of removal of existing timber piles and installation of steel piles and caps along Pier 1 West. All bidders shall comply with the provision of ORS 279C.800-870 (workers on public works to be paid not less than prevailing rate of wage for projects over$50,000). Contractors submitting bids are required to be registered with the Construction Contractor's Board. Bid security in the amount of 10% of the bid must accompany each bid in accordance with the instructions to bidders The owner reserves the right to reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject, for good cause, any or all bids upon a finding of the owner that it is in the public interest to do so in accordance with ORS 279C.395. The owner reserves the right to waive any bid. The Port seeks to engage a qualified contractor to complete the following work denoted in Exhibit Pier 1 West - Install 20 Steel Piles (80 ft length, 16" diameter, .50" wall thickness) o Remove 20 timber pile and Install 20 steel pile (Port will dispose of wood pile) o Furnish/Install HP14 I - Beam (Port will supply timbers for chocks and whalers) o Furnish/Install hardware & fasteners for pile and weld caps The Port's FY 2023-24 Pile Replacement Project provides maintenance necessary to facilitate moorage within the Central Waterfront District. The project includes removal and replacement of damaged piles in accordance with the Port of Astoria's current maintenance permit.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents