Similar Projects
I-405/SR 92, SR 520 Vic I-5 Vic and SR 9 Vic Paving and Ada Compliance
Infrastructure
Bidding
$7,500,000 to $10,000,000 est. value

I-90/I-5, E Sunset Way Vic and Nb Lowell Rd Vic Pccp Exp Jnt Rehab and Deck Overlay
Infrastructure
Bidding
Less than $1,250,000 est. value

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

8th Street Improvements Project
Alteration
Post-Bid
$739,767 est. value
Marysville, WA

Harbour Reach Drive Improvements
Infrastructure
Results
$915,224 est. value
Mukilteo, WA 98275

Fisherman's Harbor Commercial Development Parcels A8 & A17
New Construction, Infrastructure, Alteration - 6,000 SF
Results
$4,300,000 to $4,700,000 est. value
Everett, WA 98213

Airport Road Recycling and Transfer Station Scale Replacement
Infrastructure, Alteration
Bidding
$700,000 est. value
Everett, WA

Whitehorse Trail Improvements
Renovation, Alteration
Post-Bid
WA

172nd Street NE & 40th Avenue Signal and Median Improvements
Infrastructure, Alteration
Results
$1,846,000 est. value
Arlington, WA 98223

164th Street SW Transmission Main Connection
Infrastructure
Results
$10,000,000 to $12,000,000 est. value
WA

Exposed Sewer Pipe Repairs - Site 5
Infrastructure
Results
$3,200,000 to $3,700,000 est. value
Bothell, WA 98011

SR 204 Intersection Improvements
Infrastructure
Results
WA

South Lake Stevens Road Intersection Improvements
Infrastructure
Results
$5,000,000 to $7,500,000 est. value
WA

SR 9, Bickford Ave Intersection Improvement
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

Last Updated 01/03/2022 11:15 AM
Project Title

Swift Brt Orange Line Construction

Physical Address View project details and contacts
City, State (County) Everett, WA 98201   (Snohomish County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provides for improvements to construct site, roadway and signal improvements, and install Swift BRT Station Shelters and amenities at 16 Station sites along the new Swift Orange Line corridor, 1 new Station along the existing Swift Blue Line corridor, 2 new Stations that will serve as the new Swift Blue Line terminus at Sound Transit’s 185th Parking Garage, modifications to 6 existing Station Shelters along the existing Swift Green Line corridor, 1 existing Station Shelter along the existing Swift Blue Line corridor, a new transit center at Edmonds College western terminus, a re-constructed transit center at the McCollum Park Park & Ride eastern terminus, and other work all in accordance with the Contract Documents. Work is located in the cities of Lynnwood, Mill Creek, and Shoreline; unincorporated Snohomish County; and within portions of right-of-way on State Route 99, 524, and 96, and on 164th Street SW at Interstate-5 (WSDOT).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents