Similar Projects
Willmar City Hall
New Construction
Conception
Willmar, MN

City Hall - Mechanical Systems Upgrade - MBC02 - City of Minneapolis
Renovation
Conception
$4,354,500 CJ est. value
Minneapolis, MN 55415

Public Works Building Expansion
Renovation, Addition - 50,000 SF
Design
Otsego, MN 55330

Revitalization of the Town Hall Building
Renovation
Design
$20,000,000 CJ est. value
Ely, MN 55731

Olivia City Hall and Public Safety Facility
Addition, Demolition, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Olivia, MN 56277

New Town Hall
New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Deerwood, MN 56444

Public Works Facility
New Construction - 60,000 SF
Post-Bid
$12,000,000 est. value
Orono, MN 55356

Township Hall & Maintenance Garage
New Construction
Post-Bid
Mankato, MN

Juvenile Justice Center (JJC) C203 Courtroom Remodeling
Renovation - 900 SF
Results
$2,644,710 est. value
Minneapolis, MN 55415

Olmsted County Justice Center Remodel - General Construction Package
Renovation
Results
Rochester, MN 55904

City Hall Boilers - 2025-05 - City of Hermantown
Renovation
Conception
$300,000 CJ est. value
Hermantown, MN 55811

Courthouse Improvements
Renovation
Post-Bid
Blue Earth, MN

Courthouse Remodeling
Renovation
Results
Waseca, MN 56093

South Saint Paul Phase 1 City Hall, Fire, Police Renovation
Renovation
Post-Bid
South Saint Paul, MN 55075

City Hall
Renovation
Results
Saint Paul, MN 55118

Last Updated 01/10/2023 11:03 PM
Project Title

County Courthouse Renovation - Hubbard County

Physical Address View project details and contacts
City, State (County) Park Rapids, MN 56470   (Hubbard County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected March 2020
Bids Due View project details and contacts
Estimated Value $1,218,500 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project call for a three-phase restoration of the historic courthouse. Phase 1: A.) Replacing roof shingles, gutters, downspouts and cornices, at an estimated cost of $167,500. B.) It would also include upgrading the electrical system to modern capacity, at a cost of $32,500. Phase 2: Involves installing an elevator and a heat/ventilation/air conditioning (HVAC) system. Total cost is projected at $546,000. Phase 3 : Includes restoring the original cupola, estimated at $505,000. As of October 15, 2019 this project conceptual. The Hubbard County board approved a motion to pay for an architect and seek funding for construction manager. Bidding start date for architect and construction manager is unknown.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents