Similar Projects
Palm Beach Shores Water Main Improvement Project
Bidding
Riviera Beach, FL 33404

Unit 53 Arden - Parcels J, G-South and I-South Public Improvement Project
Bidding
North Palm Beach, FL

Pipeline Wet Tapping and Line Stop Continuing Construction Contract
Term Contract
Post-Bid
$5,500,000 est. value
West Palm Beach, FL 33416

Pipeline Cleaning Services
Term Contract
Post-Bid
West Palm Beach, FL 33415

46--Water Purification System
Results
Palm Beach Gardens, FL 33410

N--Domestic Water Isolation (Shutter) Valves (Va-19-00034342)
Results
Palm Beach Gardens, FL 334106400

Raw Watermain Improvements for Surficial Aquifer (SA) Wells 8A-12A and Site Demolition for SA Wells 6-12 (W1817B)
Bidding
Jupiter, FL 33458

Aerial (Pipe) Crossing, Maintenance Services
Term Contract
Post-Bid
Palm Beach, FL

1 Million and 3 Million Storage Tanks Pressure Sustaining Valve Replacement
Results
Less than $135,000 est. value
Boynton Beach, FL 33425

Reclaimed Watermain for Area 10
Post-Bid
Delray Beach, FL

Reduced Pressure Principle Backflow Prevention Assemblies
Results
FL

Pre-Qualification of Vendors Ductile Iron-Pipe and Fittings
Term Contract
Post-Bid
West Palm Beach, FL

Osceola Park Neighborhood Improvements (Phase 1)
Results
Less than $5,000,000 est. value
Delray Beach, FL 33444

Osceola Park Neighborhood Improvements (Phase II)
Post-Bid
Delray Beach, FL

Country Club Village Infrastructure Upgrade
Results
Less than $7,577,000 est. value
Boca Raton, FL 33432

Last Updated 11/11/2019 12:13 AM
Project Title

Water Main Improvements: 31st, 32nd, 33rd, 34th and 35th Streets

Physical Address View project details and contacts
City, State (County) West Palm Beach, FL   (Palm Beach County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following Project description is for general information only and should not be construed to be a complete description of all Work required. Reference should be made to the construction drawings and technical specifications, along with the General Conditions. The overall components of this project include: - Grouting and abandonment of existing potable water main and installation of new 4", 6" and 8" potable water system, installation of water services and fire hydrants - Removal of existing drainage pipe and installation of new 15" RCP pipe - Removal of existing driveways and replacement with concrete driveways - Removal and replacement of sidewalks - Lining on segments of existing gravity sewer main, point repairs and rehabilitation of specific manholes, as depicted on construction drawings - Reconstruction of the pavement, curbing, and sidewalk within the limits of the construction project. - Removal and planting of trees, as depicted on Construction Drawings

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents