Similar Projects
Turkey Hill Elementary School Air Conditioning
Bidding
$25,000 est. value
Lunenburg, MA 01462

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Town Hall HVAC - AC Condenser and Coil Replacements
Post-Bid
Less than $78,000 est. value
Westminster, MA 01473

Automated Heating Control Board
Results
Athol, MA

HVAC Annual Maintenance and Boiler Cleaning and Repair Services
Term Contract
Results
Leominster, MA 01453

Emergency Heating Repair
Post-Bid
Leicester, MA 01524

HVAC Annual Maintenance 2020-2022 (School Department)
Term Contract
Results
Leominster, MA 01453

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

HVAC Improvements Worcester Regional Airport (ORH) - General Bids
Post-Bid
Less than $1,650,000 est. value
Worcester, MA 01602

HVAC Equipment Installation at Emergency Management Agency
Results
Leominster, MA 01453

HVAC Improvements Worcester Regional Airport (ORH) - Filed Sub-Bids
Post-Bid
Less than $1,650,000 est. value
Worcester, MA 01602

On-Call Tradesperson Contracts for HVAC, Plumbing, Electrical, and General Carpentry
Term Contract
Results
Less than $20,000 est. value
Gardner, MA

Full Service Residential Weatherization Contractors
Post-Bid
Worcester, MA 01608

Partial Roof Replacement at Blackstone Valley Regional Vocational Technical High School - Sub-Bids
Results
Less than $1,129,000 est. value
Upton, MA 01568

Reported 01/11/2020 12:00 AM
Project Title

Cooling Towers 1-3 Reburbishment Project

Physical Address View project details and contacts
City, State (County) Worcester, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,500,000
Plans Available from Copy Center - 12/25/19
Owner View project details and contacts
Architect View project details and contacts
Description

The University of Massachusetts Medical School Power Plant has six existing cooling towers (No. 1-6). Towers 1-3 are original to the boiler plant built in 1970. Due to the age and condition of Towers 1-3, a refurbishment of these cells is to be completed during the winter of 2020. The refurbishment of the three towers includes demolition and asbestos abatement of the existing transite panel siding, removal and replacement of the fill and drift eliminators, as well as replacement of the existing fans, fan motors, and gear boxes.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents