Similar Projects
SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 2007 over Mud Run
Demolition, New Construction, Infrastructure
Design
$410,000 CJ est. value
East Fairfield Township, PA 16314

SR 2007 over Mud Run
Demolition, New Construction, Infrastructure
Design
$410,000 CJ est. value
East Fairfield Township, PA 16314

Water System Improvements
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Linesville, PA 16424

Water Storage Tank
Renovation, Infrastructure
Bidding
$500,000 CJ est. value
Linesville, PA 16424

Paving Bid
Infrastructure
Post-Bid
Saegertown, PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Glulam Truss Pre-Fabricated Pedestrian Bridge
Renovation
Results
Jamestown, PA 16134

Plum Street Improvements Phase 7
Infrastructure
Results
$50,000 est. value

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Homestead - Wallace Waterline Extension
Infrastructure
Bidding
$400,000 CJ est. value
Linesville, PA 16424

Bituminous Milling and Paving at Various Streets
Infrastructure
Post-Bid
Meadville, PA

PA 408 Thompson Street
New Construction, Infrastructure
Results
$1,000,000 to $2,499,999 est. value
Curwensville, PA 16406

Last Updated 02/20/2023 08:11 AM
Project Title

SR 3004 Brdg/Crooked Ck

Physical Address View project details and contacts
City, State (County) East Fairfield Township, PA 16314   (Crawford County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2030
Bids Due View project details and contacts
Estimated Value $1,170,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

State Route 3004 (Adamsville Road) Bridge over Crooked Creek East Fallowfield Township Bridge Preservation/Rehabilitation/Replacement As of February 20, 2023, the project is in development stage. Anticipated letting date is January 01, 2030. PennDOT - SR 3004 Brdg/Crooked Ck *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents