Similar Projects
Funkhouser Building Improvements
Renovation
Conception
$110,000,000 est. value
Lexington, KY 40508

Construct Research Building - University of Kentucky
New Construction
Conception
$265,000,000 est. value
Lexington, KY

College of Design
Renovation - 1,445,000 SF
Design
$38,600,000 est. value
Lexington, KY 40508

New College of Medicine
New Construction - 380,000 SF
Design
$380,000,000 est. value
Lexington, KY 40506

Improve Memorial Coliseum BP 01
Renovation, Infrastructure
Sub-Bidding
$11,000,000 CJ est. value
Lexington, KY 40508

Pavilion A - 5Th Floor Patient Room Fit-Out - BP-04 - Final Cleaning
Build-Out, Alteration
Post-Bid
Lexington, KY

Research Building #2 Phase 4 - Final Clean
Alteration
Post-Bid
Lexington, KY

UKHC Gill MRI Replacement
Renovation
Results
$250,000 est. value
Lexington, KY 40508

Renew/Modernize Frazee Hall - Bid Package 2 - All Work Categories - 2511.8
Renovation, Addition
Results
$8,816,699 est. value
Lexington, KY 40508

College of Comm & Information Studies - University of Kentucky
Addition
Pending Verification
$24,700,000 CJ est. value
Lexington, KY 40508

Psychology Building - University of Kentucky
New Construction
Pending Verification
$39,300,000 CJ est. value
Lexington, KY 40508

Renovate/Improve Nursing Units University of Kentucky Hospital - University of Kentucky
Renovation
Conception
$7,000,000 est. value
Lexington, KY 40506

Maintenance, Repair and Operations (MRO) Trade Services
Renovation, Alteration
Post-Bid
Lexington, KY

Seaton Center Racquetball Courts Phase I
Renovation
Results
$325,000 est. value
Lexington, KY 40502

Library/Knowledge Center - University of Kentucky
New Construction
Pending Verification
$183,800,000 CJ est. value
Lexington, KY 40508

Last Updated 03/30/2023 12:33 PM
Project Title

Frazee Interior Fit-Up Rebid

Physical Address View project details and contacts
City, State (County) Lexington, KY 40508   (Fayette County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $186,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Custom BT Subcontract 01C – General Requirements REBID - Marrillia Design & Construction -$186,000 Subcontract 06A – Architectural Woodworking REBID - Bruewer Woodwork Mfg -$256,400 Subcontract 08C – Doors, Hardware & Security REBID - Schiller - $318,925 Subcontract 26B – Electrical & Fire Alarm REBID - Hills Electric, LLC. - 1,560,000 The Frazee Hall Interior Fit-Up project includes modernizing the interior to fit the needs of the University of Kentucky's staff and students. This bid package is the rebid for Trade Contracts (CCK-2667R-23) shall include: 1. Clarification to Subcontract Work Categories 01C, 06A, 08C, 26B: Please note that the bid date has been changed to January 12, 2023, at 3:00PM. The written question deadline is Wednesday, 1/11/2023 at 3:00p.m. prevailing time in Lexington, KY. Questions received after this time may not receive an answer or acknowledgement. 2. Clarification to Special Conditions: Please see the attached revised special conditions. The Special Conditions were revised to reflect the following: For purposes of the rebid please ignore all references to "add alternates" in the contract documents. No add alternates are being accepted at this time. 3. Clarification to Subcontract WC 01C: Please see the attached revised WC 01C bid form. 4. Clarification to Subcontract WC 06A: Please see the attached revised WC 06A bid form. 5. Clarification to Subcontract WC 08C: Please see the attached revised WC 08C bid form. 6. Clarification to Subcontract WC 26B: Please see the attached revised WC 26B bid form. 7. Clarifications to Drawings: Specific drawings have been revised in order to clarify desired scope changes. See drawings attached along with Narrative of changes. Bidders shall review the drawings and all revisions shall be reflected in final pricing . All bids shall be accompanied by a bid guarantee of not less than five (5%) percent of the amount of the base bid. A 100% Performance Bond and 100% Payment Bond shall be furnished by the successful bidder for Trade Contracts over $250,000. All bonding and insurance requirements are contained in the Instruction to Bidders, General Conditions and Special Conditions. Performance and Payment Bonds shall be in favor of The Whiting-Turner Contracting Company as the oblige . The University of Kentucky, Construction Procurement Section, reserves the right to reject any and all bids and to waive all formalities and/or technicalities where the best interest of the University may be served.

Details

3 Stories Above Grade, 20,815 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents