Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

I-10 Rehabilitation Near Coachella
Infrastructure
Design
$157,000,000 CJ est. value
Grand Terrace, CA 92324

Carbon Canyon Water Recycling Facility (CCWRF) Asset Management and Improvements Project
Infrastructure, Renovation
Bidding
$25,500,000 CJ est. value
Chino, CA 91710

Place HMA (Type A), CSP, and Structural/Minor Concrete
Infrastructure
Bidding
$3,280,000 CJ est. value
San Bernardino, CA 92404

O'Reilly Auto Parts (CL2) / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Seventh Avenue Arrowhead Drive Road Improvement
Alteration
Results
Victorville, CA

Cold Plane AC Pavement and Place HMA and Minor Concrete
Infrastructure
Results
$12,500,000 est. value
CA

Beyond Food Mart Gas Station Development
New Construction, Infrastructure - 12,266 SF
Pending Verification
$4,000,000 CJ est. value
Rialto, CA 92377

State Route 18 from Apple Valley Inn Road/Dale Evans Parkway to Route 15 - Californian Department of Transportation
Infrastructure
Pending Verification
$2,750,000 CJ est. value
San Bernardino, CA 92404

Vineyard Avenue Pavement Rehabilitation: I-10 Freeway to Holt Boulevard - City of Ontario
Infrastructure
Conception
$445,000 CJ est. value
Rancho Cucamonga, CA 91730

Los Serranos Safe Routes to Schools East - ST210005- City of Chino Hills
Infrastructure
Design
$1,218,600 CJ est. value
Chino Hills, CA 91709

Construction of a New 1.6 MG Reservoir, Access Road and Transmission Line
Infrastructure
Bidding
$5,222,000 CJ est. value
Loma Linda, CA 92354

Last Updated 02/06/2023 11:06 PM
Project Title

Construction of the North 1st Avenue Bridge Over the BNSF Railroad

Physical Address View project details and contacts
City, State (County) Barstow, CA 92311   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $30,725,220 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 25th, 2022, project has not been awarded. Project is expected to be awarded sometime after September 7th. This construction project is located on North 1st Avenue in the City of Barstow. The City of Barstow (City), in cooperation with the California Department of Transportation (Caltrans) and the San Bernardino County Transportation Authority (SBCTA), is proposing to replace the existing two-lane North 1st Avenue bridge over the BNSF railyard with a new two-lane bridge including 8-foot shoulders and an 8-foot sidewalk. The southern terminus of the project would be just south of White Street and the northern terminus would be at Riverside Drive. The existing bridge would be demolished and removed. The North 1st Avenue Bridge Replacement Project (Project) consists of, but is not limited to, the following components: Construction of new 7-span post-tensioned concrete box girder bridge on seat type abutments and deep foundations. Removal of existing 29-span steel truss and steel / timber girder bridge across the BNSF railyard. Removal of existing building foundations. Construction of new 380-foot-long soil nail retaining wall. Realignment of North 1st Avenue approach roadway and intersections. Associated work includes utility relocation, drainage improvements, lighting improvements, pavement construction, curb ramps, sidewalks, and improvements to Del Taco parking lot. Liquidated Damages 13,500 Per Calendar Day of Delay Online Q&A Yes Q&A Deadline 06/10/2022 4:00 PM (PDT) "Base Bid" estimate for this project is approximately Forty Three Million, Three Hundred and Seven Thousand dollars ($43,680,000). Notice To Proceed: September 2022

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents