Similar Projects
I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

Washington Street Area Improvements
Infrastructure
Bidding
$9,100,000 CJ est. value
Milwaukie, OR 97222

Washington Street Area Improvements
Infrastructure
Bidding
$9,100,000 CJ est. value
Milwaukie, OR 97222

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

US26: SE Kelso Rd - Frog Lake Sno Park Section of the Mt Hood and Warm Springs Highway (Rt. No. US26) beginning in Sandy
Infrastructure
Results
$500,000 to $1,000,000 est. value
Sandy, OR

Mount Tabor Yard Maintenance Facility and Multimodal Pathway Project
New Construction
Construction
$13,500,000 est. value
Portland, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Waluga Pressure Zone Pipe Resiliency Improvements: (R- 01) - City of Lake Oswego
Infrastructure
Conception
$1,140,000 CJ est. value
Lake Oswego, OR 97035

Last Updated 07/26/2023 02:54 PM
Project Title

OR 224 Various Locations Pavement Repair

Physical Address View project details and contacts
City, State (County) Portland, OR 97222   (Clackamas County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $668,882 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bulletin Desc: Contract requires Contractor furnish, place and compact 2-inches of Level 3, half inch Dense ACP Mixture, cold plane pavement removal at 2 inches, provide and apply tack coat, furnish and install temporary pavement markings, furnish and install permanent striping and traffic control. Comply with the 2021 Oregon Standard Specifications for Construction. Emergency paving repair due to fire damage on OR224 between MP 32 and 39for the benefit of ODOT. SUBSTANTIAL COMPLETION: August 15, 2022 FINAL COMPLETION: September 1, 2022

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents