Similar Projects
RFQ Design - Multigenerational Community Resource Center
New Construction, Infrastructure
Conception
$26,400,000 CJ est. value
Surprise, AZ 85378

Share-Use Path: Consolidated to Eastern Canal Connection - CP0872 - City of Mesa
Infrastructure
Conception
$3,750,470 est. value
Mesa, AZ 85209

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Taxiway W Rehabilitation
Infrastructure
Design
$2,081,551 CJ est. value
Mesa, AZ 85212

Dickinson Waterline Replacement Project
Infrastructure
Bidding
$600,000 CJ est. value
Globe, AZ 85501

Pasquale Waterline Replacement Project
Infrastructure
Bidding
$600,000 CJ est. value
Globe, AZ 85501

RFQ Contractor - Black Mesa Low Water Crossing
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Mentmore, NM 87301

RFQ Contractor - Black Mesa Low Water Crossing
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Mentmore, NM 87301

Broadway Road Bridges at Tempe Canal
Results
$6,000,000 est. value
Phoenix, AZ 85003

Grading and Drainage Project
Results
Payson, AZ

5290 East Exeter Subdivision
New Construction
Construction
Phoenix, AZ 85018

Bungalows on Village Way - Prescott Valley
New Construction, Infrastructure
Construction
$1,000,000 to $5,000,000 CJ est. value
Prescott Valley, AZ 86327

Glendale Mixed-Use Development
New Construction, Infrastructure - 540,000 SF
Pending Verification
$40,000,000 CJ est. value
Glendale, AZ 85345

Phoenix Sky Harbor International Airport Terminal 2 Concourse Demolition and Apron Reconstruction Engineering Services
Demolition, New Construction, Infrastructure
Pending Verification
$20,500,000 CJ est. value
Phoenix, AZ 85034

Park Avenue Improvement from The BLVD to Fillmore Street - B0186 - City of Avondale
Infrastructure
Conception
$2,000,000 est. value
Avondale, AZ 85323

Last Updated 08/12/2022 02:02 PM
Project Title

Reclaimed Water Pond

Physical Address View project details and contacts
City, State (County) Safford, AZ 85546   (Graham County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $2,128,750 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 12, 2022, this project has not yet been awarded. It will not be awaraded, no plans for rebid.** The City of Safford (Owner) is requesting Bids for the construction of the following Project: Reclaimed Water Pond The Project includes the following Work: This project includes finish grading of the reclaimed water pond, installation of a 12" thick clay liner in the sides and bottom of the pond, and the installation of a concrete outfall structure. The project shall include all excavation, fill, subgrade preparation, clay liner installation, concrete installation, and piping necessary to complete the work in accordance with the project plans and specifications. Additional improvements as shown on the Drawings and noted in the Specifications shall be required. The project is expected to be substantially complete in 150 days and ready for final payment in 180 days. Questions shall be received in writing up to five (5) business days before the Bid Opening. Address all questions to Chad Crockett, PE, Bowman Consulting Group, ccrockett@bowman.com. Only written questions will be addressed. The City of Safford reserves the right to accept the lowest, responsible bid; to consider alternatives; to reject any or all bids; and to waive irregularities or information in any bid. Bids received after the specified time of closing will be returned unopened. The City of Safford also reserves the right to hold any or all bids for a period of sixty (60) days after the date of opening. Bidders will not be allowed to withdraw submitted bids during the sixty (60) day period.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents