Similar Projects
Services for Group A Fire Sprinkler Installation Design Build
Bidding
Less than $6,958,886 est. value
Decatur, Stone Mountain, GA 30032

Fire Extinguisher and Fire Suppression Systems Service
Bidding
GA

Fire Suppression, Fire Extinguisher, Sprinkler/Riser, Hood Fire Suppression Inspection and Maintenance
Post-Bid
GA

North Springs High School Fire Alarm Replacement
Post-Bid
Atlanta, GA 30328

Fire Alarm Inspections, Monitoring and Maintenance
Results
Calhoun, GA

Removal and Replacement of Fire Pump and Associated Components at Peabody Apartments
Results
Less than $60,000 est. value
Augusta, GA 30901

Fire Suppression Service
Bidding
Moody AFB, GA

Fire Safety Inspection, Testing and Maintenance
Post-Bid
Savannah, GA 30345

Georgetown K-8 HVAC and Fire Alarm Replacement
Results
Savannah, GA 31419

Group B Fire Sprinkler Installation Design Build
Bidding
Less than $7,660,102 est. value
Atlanta, Doraville, Stone Mountain, Tucker, GA 30083

Collins Hill High School Fire Alarm Replacement
Post-Bid
Suwanee, GA 30024

Derenne Middle School Fire Alarm Replacement Project
Results
Savannah, GA 31401

Group C Fire Sprinkler Installation Design Build
Bidding
Atlanta, Chamblee, Doraville, Dunwoody, Tucker, GA 30338

Sprinkler System
Post-Bid
Bainbridge, GA 39817

Inspection and Testing of Water Fire Protection Systems
Term Contract
Results
Decatur, GA

Last Updated 12/21/2020 01:20 PM
Project Title

Fire Doors Service and Replacement

Physical Address View project details and contacts
City, State (County) Warner Robins, GA 31098   (Houston County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to do yearly test all fire doors in the reference buildings below. If any discrepancies or problems are found in the test contractor is responsible to submit a repair or replacement quote, after review/negotiation an approval from CE will be granted to contractor and will be able to start work to get the doors certified.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Sliding Metal Fire Doors, Folding Doors and Grilles, Folding Doors, Accordion Folding Fire Doors.
Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents