Similar Projects
Construction of Rawson Hill Dam Rehabilitation Project - Worcester County, Massachusetts
New Construction
Design
$1,000,000 to $5,000,000 est. value
MA

On-Call Tunnel Repairs Systemwide
New Construction
Bidding
Boston, MA

Wachusett Dam Bastion Improvements
Renovation
Bidding
$4,033,260 est. value
Clinton, MA

Spring Street Tide Gate Replacement
Post-Bid
Everett, MA 02149

Muzzy Dam Flow Control Gate Replacement and Dam Repairs Project
Post-Bid
Spencer, MA

Piper Pond Dam Repairs
Results
$247,690 est. value
West Springfield, MA

Watershops Pond Dam Rehabilitation
Results
$577,810 est. value
Springfield, MA

Hydraulic Structures Maintenance and Repairs Annual Contract
Term Contract
Bidding
Holyoke, MA

Cady Brook Diversion Dam
Results
$610,483 est. value
Pittsfield, MA

Lake Holbrook Dam Rehabillitation
Results
$900,000 est. value
Holbrook, MA 02343

Wachusett Reservoir North Dike and South Dike Instrumentation
Results
Less than $240,000 est. value
West Boylston, MA

Sawmill Pond Dam Rehabilitation
Results
Less than $360,000 est. value
Plymouth, MA

Repairs to Hatchet Pond Dam
Results
$143,000 est. value
Southbridge, MA

Diversion Gates Outlet Modifications - General Bid
Results
$1,277,677 est. value
Agawam, MA

Diversion Gates Outlet Modifications - Filed Sub Bid
Results
Less than $730,000 est. value
Blandford, MA

Last Updated 11/09/2021 10:16 AM
Project Title

North Reservoir Spillway Replacement Project

Physical Address View project details and contacts
City, State (County) Winchester, MA   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $180,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The North Reservoir Spillway Replacement Project includes the replacement of the existing 22-feet long by 2-feet high concrete spillway with a new cast-in-place 22-feet long by 2.5-feet high concrete spillway and operable 3-feet wide aluminum slide gate.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents