Similar Projects
New Womens Gymnastics Spirit Squad Training Center
New Construction - 30,000 SF
Conception
$7,000,000 to $9,000,000 est. value
Iowa City, IA

Medical Laboratories - Medical Research Center - Renovate 2nd Floor for Pediatric Research
Renovation
Bidding
$5,538,000 CJ est. value
Iowa City, IA 52242

University of Iowa Hospitals and Clinics (UIHC) - Iowa River Landing - Replace Exterior Canopy Glass
Renovation
Post-Bid
$295,542 CJ est. value
Iowa City, IA 52242

University of Iowa Hospitals and Clinics (UIHC) - Iowa River Landing - Replace Exterior Canopy Glass
Renovation
Post-Bid
$295,542 CJ est. value
Iowa City, IA 52242

UI Currier Residence Hall - Renovate First Floor Living Spaces
Renovation
Results
Iowa City, IA 52242

Burge Residence Hall - Renovate Basement Space
Renovation
Results
$248,000 est. value
Iowa City, IA 52245

Football Locker Room Renovation
Renovation
Post-Bid
$400,000 CJ est. value
Iowa City, IA 52242

Hospitals and Clinics - Pomerantz Family Pavilion - LL3 Replace ATS Serving ASC
Renovation
Results
$300,000 est. value
Iowa City, IA 52242

RFQ Subcontractors - University of Iowa South Quadrangle Building - Demolition
Demolition
Post-Bid
$250,000 CJ est. value
Iowa City, IA 52242

Hospital Parking Ramp No.3 - Renovate Elevator Bank and Control Room
Infrastructure
Results
$1,190,000 est. value
Iowa City, IA 52242

UIHC Roy Carver Pavilion L1 Emergency Department Expansion Bid Package #1
Renovation
Post-Bid
Iowa City, IA 52242

University of Iowa Hospitals and Clinics - Roy J. Carver Pavilion LL2 Interim Emergency Power
Renovation
Results
Iowa City, IA 52242

Wendell Johnson Speech and Hearing Center - Renovate Room 7 into Research Lab
Renovation
Results
$63,809 est. value
Iowa City, IA 52242

Iowa Wrestling Training Facility
New Construction - 37,000 SF
Results
$17,200,000 est. value
Iowa City, IA 52242

Iowa Memorial Union - Install Show Dorm Room
Renovation
Results
$110,000 est. value
Iowa City, IA 52245

Last Updated 06/07/2023 11:41 AM
Project Title

UIHC - General Hospital Upgrade Stairwells

Physical Address View project details and contacts
City, State (County) Iowa City, IA 52242   (Johnson County)
Category(s) Education, Medical
Sub-Category(s) College/University, Hospital
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,521,980 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

A. This contractor shall furnish all the labor and material necessary to install a complete electrical system for the building. The system shall include all items of work as outlined in these specifications and on the drawings. B. All work shall be performed by a well-qualified, licensed electrician with a thorough knowledge of the various systems involved in this building. It shall be this contractor's responsibility to see that their employees are familiar with all the various codes and tests applicable to this work. C. All equipment shall be new and of the type specified by the engineer unless otherwise noted in these specifications or on the drawings to remain and or be reused. D. The intent of the specifications and drawings is for complete installation of the systems outlined in the specifications and drawings so that at the conclusion of construction the system will be turned over to the owner complete and ready for safe and efficient operation. The specifications and drawings cannot deal individually with the many minute items that may be eventually required by the nature of the systems. Targeted Small Business (TSB): The certified Iowa TSB participation goal for this project is 10 percent (10%) of the Base Bid. This establishes the amount that should be reported on the Final Payment Reporting Form as part of the TSB Program This project renovates finishes in 12 stairwells at UIHC: Per the stair study stair #s are as follows:12,13,21,23,28,30,33,36,40,44,51,and 53.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Automatic Entrances, Windows, Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Treatments, Window Blinds, Casework, Countertops, Rugs and Mats, Furniture, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Healthcare Furniture, Multiple Seating.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents