Similar Projects
Washington - Liberty High School Stadium Field - Arlington County
New Construction, Infrastructure
Conception
$590,000 CJ est. value
Arlington, VA 22201

Williamsburg Middle School Synthetic Fields - Arlington County
New Construction, Infrastructure
Conception
$1,161,000 CJ est. value
Arlington, VA 22209

The Elliott
Demolition, New Construction, Infrastructure
Design
$105,000,000 CJ est. value
Arlington, VA 22203

Bozzelli At The Concord
Renovation - 3,000 SF
Post-Bid
Arlington, VA 22202

WG & CC Lower Level Kitchen Expansion
Renovation - 5,402 SF
Post-Bid
Arlington, VA 22207

Main Entrance Relocation and Renovations to Gunston Middle School
Renovation
Results
Arlington, VA 22206

Silver Diner
Build-Out - 6,700 SF
Construction
Arlington, VA 22203

Renovation to Transportation Staff Facility
Renovation
Construction
Less than $2,200,000 est. value
Arlington, VA

New Career Center
New Construction
Pending Verification
$150,000,000 to $170,000,000 est. value
Arlington, VA 22204

Astro Beer Hall Shirlington
New Construction - 14,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Arlington, VA 22206

Construction Management Services for Danville Public Schools
Renovation
Post-Bid
Arlington, Danville, VA 22207

Chopt #186
Build-Out - 1,911 SF
Construction
Arlington, VA 22203

Harris Teeter #86 Mixed-Use Development / Arlington
New Construction, Infrastructure - 81,443 SF
Pending Verification
$300,000,000 CJ est. value
Arlington, VA 22203

Compass Coffee - Arlington
Build-Out - 2,689 SF
Post-Bid
Arlington, VA 22207

Compass Coffee Demo
Renovation
Construction
Arlington, VA 22207

Last Updated 11/21/2022 08:36 AM
Project Title

Swanson Middle School Kitchen and Entrance Renovation

Physical Address View project details and contacts
City, State (County) Arlington, VA 22205   (Arlington County)
Category(s) Commercial, Education
Sub-Category(s) Food/Beverage Service, Middle/Senior High School
Contracting Method Competitive Bids
Project Status All Submissions Received, Selection Underway, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $787,490 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

All questions regarding this solicitation, other than those submitted at the Conference, must be submitted in writing via email, addressed to Brandon Christian, Procurement Office, Senior Procurement Specialist, at brandon.christian@apsva.us, with copies to Robin Hodges, Facilities and Operations, Project Manager, at robin.hodges@apsva.us and Teresa Hamm-Modley, Owner's Representative (Architect), at hammmodley@vmdo-dc.com. Questions must be received by 5:00 P.M. local time, November 1, 2022. Site Walkthrough - To reserve a place on the Site visit Bidders are required to contact the Arlington Public Schools Project Manager no later than 5:00 PM on October 17, 2022. The Arlington Public Schools Project Manager will meet the, Bidders' representatives promptly at 1:00 P.M. at Door One (1). If there are more than nine (9) reservations received the Arlington Public Schools Project Manager will conduct a second Site visit immediately following the completion of the first Site visit. Bidders' representatives must not enter the building without the Arlington Public Schools Project Manager being present. Project Description and Background: APS is currently seeking Bids for the Project. The Contractor will be responsible for furnishing all tools, equipment, labor, materials, and miscellaneous items needed for a complete turnkey Project. The Contractor's responsibilities are described in the Construction Documents and shall generally include but are not limited to the following: 1. Selective demolition including but not limited to: Partitions, doors, frames, flooring, ceilings Wall mounted accessories and other items noted Concrete slab at kitchen and exterior sidewalk Storefront Mechanical, Electrical, Plumbing Systems Fire alarm device/cabling 2. Modifications to the existing administration suite and kitchen to include new: Metal stud and gypsum board partitions Doors, frames, and hardware Ceilings Mechanical, Electrical, and Plumbing systems Lighting and power systems Low voltage voice and data cabling Millwork/casework New storefront / entrance vestibule / bridge Sidewalk Painting and other finishes Rooftop equipment, roof curbs, and roof patching 3. Modification to the fire alarm system and sprinkler system

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Furniture, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents